Wins Parking

Mixed-Power EV Site Design: L2 + DCFC + MCS

How to lay out a commercial parking site that is 80% Level 2 + 20% DC fast today, but has the conduit and panel headroom for Megawatt Charging System (MCS) Class 8 trucks in 2028 — without trenching the lot a second time.

Why Mixed-Power Beats Single-Modality Sites

A mixed-power site combines Level 2 for long-dwell destination charging, DC fast for short-dwell top-up, and MCS for heavy-duty trucks on one property — sharing transformer capacity, switchgear, payment infrastructure, and load management while preserving each modality's user experience. The design challenge is integrating three radically different electrical and geometric requirements rather than running them in parallel.

EV stall geometry & ADATransformer service upgrades

The 80/18/2 Day-One Mix

For 2026 deployments with a 5-to-10-year horizon, the right day-one mix is roughly 80% Level 2, 18% DCFC, and 2% MCS-ready (conduit and panel only). That anticipates a day-10 mix near 45% L2, 35% DCFC, and 20% MCS — and the infrastructure laid today must reach that endpoint without trenching the lot twice.

EV-ready retrofit vs greenfieldOur Design pillar

Future-Proofing Math: Conduit & Panel Headroom

Future-proofing for MCS adds 6 to 12 percent to day-one electrical capex — an oversized transformer, panel headroom of 30 to 50 percent above day-one demand, and a 6-inch conduit spare per future MCS port. The alternative 2028 retrofit costs $380,000 to $640,000 versus $65,000 to $85,000 today: an 8x to 10x multiple.

NEVI & 30C capital stackDesign my site