Robotaxis Now Run 24/7. How Should Depot Sites Plan for It?

Tesla says its Robotaxi service now runs 24/7 in every city it serves. Depots lose the overnight charging window. Here is how owners should plan charging, power, operations and lease terms.

Wins Parking 6 min read
On this page
  1. What changed this week
  2. Why 24/7 service changes depot math
  3. Charging: plan for constant turnover
  4. Power: let software share the load
  5. Site operations around the clock
  6. Zoning and neighbors
  7. Questions to ask before you sign a depot lease
  8. How Wins Parking handles this work
  9. Next step

Robotaxi fleets no longer park for the night. On November 11, 2026, Tesla said its Robotaxi service now runs 24/7 in every city it serves. For a depot owner, that means charging, cleaning, security and snow work all happen while cars keep coming and going, so the site has to be planned for constant turnover, not one overnight fill.

What changed this week

Tesla's Robotaxi account posted "Robotaxi now runs 24/7" on November 11, 2026, and said it applies to every city where the service is available, according to TeslaNorth. In late October the service ran from 6 AM to 2 AM. Then it moved to 5 AM starts. Now there is no closed window at all.

Two days earlier, Tesla launched service in San Antonio, Axios reported. Waymo already runs about 100 vehicles there. Tesla appeared to have just one car at launch. Its Houston launch in April started with two. Fleets start small. Then they grow.

The facilities follow. In June, Tesla applied to build a 56-stall charging hub for its private robotaxi fleet at 245 W. Josephine St. in San Antonio, per the San Antonio Express-News via GovTech. The hub is not open to the public. The same report said Tesla has proposed 56-stall robotaxi sites in the Phoenix area too.

Why 24/7 service changes depot math

A delivery van fleet comes home at 6 PM and leaves at 6 AM. That gives a depot a 12-hour window to charge every vehicle. Slow chargers work. Peak loads stay low.

A 24/7 robotaxi fleet has no such window. Cars return to charge when their battery runs low or demand drops. Some come in at 3 AM. Some come in at 2 PM. The depot becomes a pit stop that never closes.

That shift changes four things:

  • Charger speed. Short stops need faster chargers. Tesla's Cybercab does not support AC charging, Not a Tesla App reported. It uses a NACS port and DC charging.
  • Stall turnover. Each stall serves more cars per day. Queue space and circulation matter as much as stall count.
  • Peak demand. Charging can overlap the utility's afternoon peak. That can raise demand charges.
  • Staffing. Someone, or something, must be on site every hour of the day.

Charging: plan for constant turnover

Start with the operator's duty cycle, not a stall count. Ask how many cars will visit per hour at the busiest time. Ask how long each car will stay. Ask what state of charge it needs when it leaves.

The U.S. Department of Energy tells fleets to gather the same data before they design smart charging: vehicle counts, battery capacities, charger levels and dwell periods, per its Federal Energy Management Program guidance. Telematics data gives the most accurate picture.

Then plan the layout around flow:

  • One-way circulation so cars do not block each other.
  • Staging lanes for cars waiting on a stall.
  • Separate zones for charging, cleaning and minor service.
  • Pull-through or angled stalls where the charger and port location allow.

Charging hardware is also changing. Tesla employees plug in robotaxis by hand today. Tesla executives said the company plans to use its Optimus robots as a stopgap. Its long-term goal is wireless charging, with an Austin hub planned for 80 wireless chargers. Leave conduit, pad space and power capacity for the next method, not just the current one.

Power: let software share the load

A 24/7 depot cannot always push full power to every stall. Smart charge management fixes that. It caps total load and splits power by need.

DOE gives a simple example. Five Level 2 chargers at 7 kW each could draw 35 kW. If only 30 kW is available, the system can cap each charger at 6 kW. It can also give priority to cars with a lower state of charge or a shorter stay.

DOE lists the inputs that matter:

  1. The utility rate structure, including time-of-use pricing and demand periods.
  2. Building loads from smart meters.
  3. Transformer capacity and current use.
  4. Open protocols such as OCPP for charger control and OpenADR for utility demand response.

Ask the utility about capacity early. Transformer upgrades can set the whole project schedule.

Site operations around the clock

A depot that never closes needs operations that never stop.

Lighting and cameras. Night arrivals need even lighting across stalls, lanes and walkways. Cameras and license plate recognition log every car in and out. That record helps with billing, access control and incident review.

Access control. Most robotaxi hubs are private. Gates, LPR whitelists and clear signs keep public drivers out of fleet stalls.

Cleaning and service. Tesla has added car-cleaning robots at some robotaxi hubs, Not a Tesla App reported. Plan wash bays, trash pickup and storage for supplies.

Snow and ice. In snow country, you cannot wait for an empty lot to plow. Plan snow storage away from stalls and drains. Clear lanes in sections while cars keep moving. Mark charger islands so plows do not hit them.

People on site. Even with automation, a person still resets equipment, moves a stuck car or handles a crash. Plan a staff room, restroom and safe walking paths.

Zoning and neighbors

A 24-hour use draws more questions than a daytime lot. Expect hearings to ask about hours, light spill, noise from chargers and cooling fans, and traffic at night. The San Antonio site, for example, sits next to a school, per the Express-News report.

Bring a site plan that answers those questions up front: shielded light fixtures, planted buffers, entry points away from homes and a clear traffic count.

Questions to ask before you sign a depot lease

If an operator wants to lease your lot or garage, get answers to these first:

  1. How many vehicles will use the site at peak hour, and how long will each stay?
  2. What charging method will you use now, and which one in three years?
  3. Who pays for utility upgrades, and who owns the equipment at lease end?
  4. Who handles snow, cleaning, security and repairs, and at what hours?
  5. What happens to the site if the fleet shrinks or moves?
  6. Will the site carry other traffic, like public parking, at the same time?

The answers decide the lease rate, the term and the build-out.

How Wins Parking handles this work

Wins Parking designs, builds and manages robotaxi and fleet charging depots. Our autonomous vehicle parking team plans stall layouts, staging lanes and circulation for vehicles that drive themselves in and out.

Wins Design & Build, our construction division, handles paving, drainage, striping, lighting and snow plans. We install EV charging and coordinate utility upgrades through our EV charging program.

After the site opens, our parking management services cover LPR cameras, access control, enforcement and day-to-day operations. We have served owners from the Vail Valley since 2016, and we work with owners across the country. See our case studies for examples of our work.

Next step

Thinking about hosting a robotaxi depot or converting a lot for 24/7 fleet use? Call (970) 279-1744 or start at https://winsparking.com/contact.

Frequently asked questions

Why does 24/7 robotaxi service matter to parking owners?

A fleet that runs all day and night has no single overnight charging window. Cars return to charge at all hours, so a depot needs faster chargers, more turnover per stall, staging lanes and round-the-clock staff, lighting and security.

How many stalls does a robotaxi charging hub need?

It depends on the fleet's peak visits per hour, dwell time and charging speed. For reference, Tesla's proposed private hubs in San Antonio and the Phoenix area were reported at 56 stalls each.

Can a robotaxi depot share a lot with public parking?

It can, but fleet stalls usually need to be private. Gates, license plate recognition whitelists and clear signs keep public drivers out of fleet charging areas while the rest of the lot serves the public.

What is smart charge management?

It is software that monitors and controls chargers so total power stays within the site's limit. The U.S. Department of Energy notes it can split available power across chargers and give priority to vehicles with lower charge or shorter stays.

Does Wins Parking build robotaxi depots?

Yes. Wins Parking designs, builds and manages robotaxi and fleet charging depots, including layout, paving, drainage, lighting, EV charger installation, LPR cameras and daily operations. Call (970) 279-1744.

Sources

  1. teslanorth.com
  2. axios.com
  3. govtech.com
  4. notateslaapp.com
  5. energy.gov

How Wins Parking can help

Ready to Unlock Your Parking Revenue?

Request a proposal. Tell us about your property and we'll show you what's possible.

Your mobile information will not be sold or shared with third parties for promotional or marketing purposes.

Privacy Policy | Terms

Prefer to talk? Call or text 877-713-WINS (877) 713-9467 or (970) 279-1744