EV AND ROBOTAXI CHARGING · MINNEAPOLIS, MN
EV Charger and Robotaxi Charging Installation in Minneapolis, MN
Wins Parking plans, permits, builds and runs EV charging for Minneapolis owners, from downtown skyway garages to fleet yards in the North Loop and along I-94. Minneapolis ended parking minimums citywide in 2021, Waymo lists the city as up next, and winters average 51.2 inches of snow at MSP. The Department of Energy lists 309 public Level 2 and 37 DC fast ports.
- public Level 2 ports (AFDC)
- 309public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 37public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to MSP, the service airport
- 6 mito MSP, the service airport
Get a free EV charger quote in Minneapolis
Minneapolis by the numbers
No minimums
Minimums ended citywide in May 2021; maximums limit new parking
Minneapolis 2040, Parking, loading and mobility regulationsChecked Oct 14, 2026
309 L2 · 37 DC fast
Public charging ports in Minneapolis, pulled Oct 14, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 14, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 51.2 in. of snow and 12.5 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 14, 2026
104.8 cost index
Minneapolis-St. Paul-Bloomington, MN-WI Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities, 2024Checked Oct 14, 2026
MSP · 6 miles
Minneapolis–Saint Paul International Airport, the service airport for Minneapolis
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 14, 2026
The chargers
Which EV chargers suit Minneapolis parking lots?
Minneapolis lists 309 public Level 2 and 37 DC fast ports in AFDC data pulled Oct 14, 2026, a modest count for its size, so a garage or lot that adds a row of chargers fills a visible gap.
Heated skyway garages downtown, North Loop apartments and the university and hospital campuses suit Level 2. Fast charging fits delivery fleets along I-94 and I-35W and rideshare near MSP.
Our Minneapolis EV charging station installation guide covers the service; this page adds the winter engineering and the city data.
Downtown towers linked by the skyways, the University of Minnesota's lots, the hospital campuses and the apartment buildings in Uptown and Northeast all suit Level 2. Fast charging fits delivery fleets and travelers near I-94 and I-35W.
The depot
What does a Minneapolis robotaxi charging depot need?
Waymo lists Minneapolis under "Up next" as of Oct 14, 2026; no driverless service carries riders yet.
Winter is the test: a depot here needs heated or enclosed staging where possible, plowable layouts, chargers rated for deep cold and space for snow storage, plus fast chargers, cleaning bays, a rider curb and gated entry.
Structured parking downtown may suit a fleet better than surface lots. Our guides cover autonomous vehicle parking, future-proof parking design and the EV and AV deployment guide. See also robotaxi depot design in Minneapolis.
Snow storage, heated staging and covered charging rows would weigh more in a Minneapolis depot than almost anywhere else on Waymo's list.
The network
How many public EV chargers does Minneapolis have?
AFDC data from Oct 14, 2026 lists 141 public stations in Minneapolis with 309 Level 2 and 37 DC fast ports.
With only 37 fast ports, the city has one of the smallest fast networks in this batch. Cold weather slows charging, so drivers here need more charging time, not less.
The EV charging ports database tracks Minneapolis's count month by month.
The 141 stations average 2.5 ports, and only about 11% of ports are fast. Fast charging is where Minneapolis is thinnest.
The power
Which utility serves Minneapolis chargers, and what does it offer?
Xcel Energy serves Minneapolis and, as of Oct 14, 2026, offers Minnesota EV Rebates for charging infrastructure and chargers; its page does not list the amounts.
The account holder starts with a capacity check and an interest form; an Xcel advisor reviews the application, and an approved project gets a reservation letter with its amount and completion date. We price the job without the rebate until that letter arrives.
Capacity review comes first, and a new transformer sets the start date.
The code
Which permits and codes apply to EV chargers in Minneapolis?
CPED cites about 10 business days for preliminary development review; NEC Article 625 sets the wiring rules and the U.S. Access Board the accessible-space guidance.
Minneapolis ended parking minimums citywide in May 2021, and maximums limit new parking. Stall conversions need no variance.
The accessible charger is placed first, clear of snow storage.
About 10 business days is a short review by the standards of this list, so equipment and Xcel lead times set most schedules.
The incentives
What EV charging incentives are open to Minneapolis sites?
Xcel's Minnesota EV Rebates come first, and state programs are listed on the AFDC page.
Since June 30, 2026, the federal 30C credit has been closed to newly installed chargers, as the IRS Instructions for Form 8911 state.
Tenant demand in apartments drives most Minneapolis projects.
The budget
What does EV charger installation cost in Minneapolis, and how long does it take?
Twelve Minneapolis Level 2 ports run about $50,300 to $113,200 installed and four DC fast ports about $210,000 to $629,000, by our estimate.
The city's BEA index is 104.8, above the national average. We scale national per-port costs and AFDC's installation guidance to it; in our planning, frozen ground limits trenching to roughly April through November.
Level 2 on existing capacity usually lands 8–16 weeks after permits; fast charging on a new service runs 26–52 weeks, mostly waiting on equipment and the utility (Wins estimate).
Per port, Minneapolis lands near $4,192 to $9,433 for Level 2 and $52,500 to $157,250 for fast charging before any Xcel rebate, by our estimate. Frozen ground can push trenching into spring, and heated enclosures add cost.
What would chargers cost in Minneapolis?
Wins Parking estimateCharger type
Installed cost
$25,200–$56,600
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Minneapolis's BEA cost index of 104.8. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Minneapolis chargers run day to day?
Minneapolis chargers run on the same software as our gates: we set session prices, start idle fees after a grace period, watch every port around the clock, enforce charging-only stalls and send a monthly report.
Deep cold stiffens cables and slows charging, so we choose cold-rated units, keep cables off the ground and inspect before winter.
Our EV charging parking management guide explains the model, and the Minneapolis parking management page shows the rest of the service.
MSP's normals show a coldest-month low near 9°F, 51.2 inches of snow a year and only 4 months averaging lows at or above 50°F. Cold cuts charging speed and stiffens cables, so we choose cold-rated units, keep cords on retractors and plan plow routes around every row.
The neighbors
How does Minneapolis compare with nearby metros for EV charging?
Minneapolis has 37 fast ports; Madison, about 231 miles southeast, has 81, per AFDC data pulled Oct 14, 2026.
Minneapolis is the only city in the table on Waymo's list; the others have no announced driverless service.
St. Paul, across the Mississippi, is a separate city with its own permits; Chicago, about 354 miles southeast, is the nearest larger network.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Minneapolis, MN (this page) | Xcel Energy | Minneapolis Community Planning and Economic Development | About 10 business days | 309 · 37 |
| Sioux Falls, SD | Xcel Energy | Sioux Falls Building Services | Not published (Wins estimate: 3–6 weeks) | 72 · 36 |
| Fargo, ND | Xcel Energy | Fargo Inspections Department | Not published (Wins estimate: 3–6 weeks) | 51 · 32 |
| Cedar Rapids, IA | Alliant Energy | Cedar Rapids Building Services | Not published (Wins estimate: 3–6 weeks) | 52 · 15 |
| Madison, WI | Madison Gas and Electric (MGE) | Madison Building Inspection Division | Not published (Wins estimate: 3–6 weeks) | 260 · 81 |
| Des Moines, IA | MidAmerican Energy | Des Moines Permit and Development Center | Not published (Wins estimate: 3–6 weeks) | 75 · 40 |
Review times are published targets unless marked as a Wins estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.
FAQ
Minneapolis EV and robotaxi charging: frequently asked questions
Yes. Its Minnesota EV Rebates program covers infrastructure and chargers, with the amount set per project in a reservation letter, as of Oct 14, 2026.
Waymo lists Minneapolis as up next, as of Oct 14, 2026. Wins has no robotaxi client in Minnesota.
309 Level 2 and 37 DC fast ports at 141 public stations, per the Department of Energy on Oct 14, 2026.
CPED cites about 10 business days for preliminary development review.
No. They ended citywide in May 2021; maximums limit new parking.
MSP averages 51.2 inches of snow a year, so we use cold-rated units and plan around snow storage.
Late spring through early fall. Only 4 months average lows at or above 50°F, and frozen ground slows trenching.
About $50,300 to $113,200 for twelve ports installed, by our estimate.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
- IRS, Instructions for Form 8911, checked Oct 14, 2026
- U.S. Access Board, EV charging guidance, checked Oct 14, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
- Xcel Energy, business EV charging, checked Oct 14, 2026
- Minneapolis Community Planning and Economic Development, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Minnesota laws and incentives, checked Oct 14, 2026
- Waymo, Where we're going, checked Oct 14, 2026
- BEA Regional Price Parities, 2024, checked Oct 14, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026
Last updated

About the author
John Davis
Content Writer
John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.