Wins Parking plans, permits, installs and runs EV chargers and fleet charging depots for Providence lots. The city lists 190 public Level 2 ports but only 19 DC fast ports with the Department of Energy, and the state's ChargeRI rebates cover 80–90% of eligible Level 2 costs, within caps.
- public Level 2 ports (AFDC)
- 190public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 19public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to PVD, the service airport
- 7 mito PVD, the service airport
Get a free EV charger quote in Providence
Providence by the numbers
Minimums outside downtown
No minimums downtown (D-1) or for housing in the transit overlay; the first 2,500 sq ft of nonresidential space is exempt in R-P, C-2 and C-3
Providence Zoning Ordinance (official, as amended July 22, 2026)Checked Oct 13, 2026
190 L2 · 19 DC fast
Public charging ports in Providence, pulled Oct 13, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 13, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 36.6 in. of snow and 11.9 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 13, 2026
101.8 cost index
Providence-Warwick, RI-MA Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities (via FRED RPPALL39300)Checked Oct 13, 2026
PVD · 7 miles
Rhode Island T. F. Green International Airport, the service airport for Providence
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 13, 2026
The chargers
What EV chargers does Wins install for Providence parking lots?
Level 2 chargers, rated by the Department of Energy at 2.9 to 19.2 kW, and DC fast chargers of up to 500 kW, which add 100 to 200+ miles in about 30 minutes.
Level 2 matches how most Providence cars park: students and staff for a full day, residents overnight, visitors for a few hours downtown. DC fast fills the gap the city's network shows, serving ride-hail drivers, delivery fleets and retail near I-95 and I-195. A common first phase is eight to twelve Level 2 ports with conduit for one or two fast units.
Wins designs, permits, installs and then operates the stations. Every session posts to the software behind our plate cameras, so charging and parking revenue appear on one statement.
The depot
What does a robotaxi charging depot in Providence need?
Fast chargers sized to the fleet's daily miles, a service agreement with Rhode Island Energy, staging lanes, cleaning bays, a pickup zone, access control and cameras. No operator had announced Providence service as of Oct 13, 2026.
Boston, about 41 miles northeast, is the closest place with activity: Waymo said on Feb. 5, 2026 that it is returning there to test and that Massachusetts must legalize fully driverless vehicles before the public can ride. Waymo's updates page lists Boston as "up next." That is regional context only; no operator has named Providence, and Wins has no robotaxi work in Rhode Island.
A lot can still be planned so it never needs rebuilding: spare electrical capacity for fast chargers, room for cars to queue off the street, a covered bay for cleaning and a pickup lane away from the charging rows. Our autonomous vehicle parking overview, the future-proof lot design guide and the EV and AV deployment guide cover each part.
The network
How many public EV charging ports does Providence have?
190 Level 2 and 19 DC fast ports at 88 public stations with Providence addresses, per Department of Energy data pulled Oct 13, 2026.
That works out to about one public Level 2 port per 1,030 residents, but only 1 fast port for every 10 Level 2 ports. Warwick, home to the airport, lists 38 fast ports, twice Providence's count. Most Providence households rent, per the Census Bureau, so chargers at apartment buildings and public lots matter more here than home charging.
Our EV charging ports database updates Providence's figures monthly from the same federal source.
The power
Which utility serves Providence chargers, and what programs does it run?
Rhode Island Energy serves Providence. We could not confirm an open commercial charger rebate from the utility as of Oct 13, 2026; the state's ChargeRI program is the main source of money.
ChargeRI, run by the Office of Energy Resources, pays 90% of eligible Level 2 costs at apartment buildings with five or more units, up to $12,000 a station and $100,000 a site. Public lots and workplaces get 80%, up to $10,000 per Level 2 station and $60,000 per site, and public lots can add DC fast at up to $50,000 a station. Sites in state environmental justice areas get 5 percentage points more.
Rhode Island Energy still decides whether the service can carry the new load. We ask for its capacity review before the design is final, because a transformer upgrade often sets the schedule.
The code
Which permits and codes apply to EV charging stations in Providence?
An electrical permit from the Department of Inspection and Standards, an electrician licensed by the state Department of Labor and Training, NEC Article 625 and Access Board guidance.
Removing spaces a site plan required, or adding a transformer pad, can bring zoning review, and any zoning board decision carries the 20-day appeal window in § 45-24-69. Providence publishes no electrical permit review target; we plan three to six weeks, an estimate.
ChargeRI requires at least one accessible space at each site, which we design first: a level route, controls and cord within reach and room beside the car for a lift. Disturbing an acre or more brings RIDEM's construction general permit.
The incentives
Which EV charging incentives are open in Rhode Island?
ChargeRI rebates of 80–90% of eligible costs, with $3,197,135 left on the Oct. 8, 2026 tracker. The federal 30C credit cannot be claimed for charging property placed in service after June 30, 2026 (IRS, Instructions for Form 8911).
The IRS instructions set that cutoff, so new chargers earn no federal credit. ChargeRI fills much of the gap, but its rules shape the project: no equipment may be bought before the state's approval letter, the work must finish within six months, and every station needs a network contract of at least three years.
Providence is also one of 18 municipalities in RI NEVI Phase 2, which the state says puts more than 100 stations into development, construction or service. Sites that receive NEVI money cannot also claim ChargeRI.
The budget
What does an EV charger installation cost in Providence, and how long does it take?
By Wins Parking's estimate, ten Level 2 ports cost about $40,700 to $91,600 installed in Providence, and two DC fast ports about $102,000 to $305,000, before any ChargeRI rebate.
Trenching is the first cost driver, priced by the foot from the electrical room to the stalls; on College Hill, narrow streets and older curbs can slow the work. Service size is second, since fast charging nearly always needs new service from Rhode Island Energy. The age of the building's switchgear is third.
Timeline, our estimate: 8–16 weeks for Level 2 on an existing panel and 26–52 weeks for fast charging on new service. The ranges scale national per-port costs and AFDC's installation cost guidance by the metro's BEA index of 101.8. ChargeRI's six-month deadline and the 4-month warm season both shape the start date.
What would chargers cost in Providence?
Wins Parking estimateCharger type
Installed cost
$24,400–$55,000
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Providence's BEA cost index of 101.8. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Providence chargers run day to day?
On the platform that runs the parking: Wins sets charging prices and idle fees, monitors every port 24 hours a day, keeps EV spaces clear with plate cameras and bills both on 1 monthly statement.
Idle fees keep a finished car from holding a port through a full class day. When a station drops offline, an alert reaches us, often before a driver notices. The monthly report shows parking income, charging income, kilowatt-hours sold, uptime by port and citations, and the network contract ChargeRI requires is already part of our setup.
It matches our EV charging parking management service and pairs with parking management in Providence when Wins runs the whole lot.
The neighbors
How does Providence compare with nearby cities for EV charging?
Providence's 190 Level 2 ports lead the table, but Warwick has 38 fast ports to its 19, and East Providence and Pawtucket have none, per AFDC data pulled Oct 13, 2026.
Rhode Island Energy serves all six cities, and ChargeRI applies statewide. Each city runs its own permit office, and none publishes a review target for a commercial electrical permit.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Providence, RI (this page) | Rhode Island Energy | Providence Dept. of Inspection and Standards | Not published (Wins estimate: 3–6 weeks) | 190 · 19 |
| East Providence, RI | Rhode Island Energy | City of East Providence | Not published (Wins estimate: 3–6 weeks) | 25 · 0 |
| Pawtucket, RI | Rhode Island Energy | City of Pawtucket | Not published (Wins estimate: 3–6 weeks) | 22 · 0 |
| Cranston, RI | Rhode Island Energy | Cranston Building Inspection | Not published (Wins estimate: 3–6 weeks) | 42 · 8 |
| Warwick, RI | Rhode Island Energy | City of Warwick | Not published (Wins estimate: 3–6 weeks) | 82 · 38 |
| Woonsocket, RI | Rhode Island Energy | City of Woonsocket | Not published (Wins estimate: 3–6 weeks) | 15 · 0 |
None of these offices publishes a review target for a commercial electrical permit, so each review time is a Wins Parking estimate. Rhode Island Energy serves every city here; the state's ChargeRI rebates apply in each. Ports: AFDC, public and open.
FAQ
Providence EV and robotaxi charging: frequently asked questions
Wins Parking does. We design, permit, install and operate Level 2 chargers for Providence apartment buildings, apply for ChargeRI, which pays 90% of eligible costs for buildings with five or more units, and bill residents through the same app as their parking. We estimate $4,000–$9,000 per installed port before rebates.
Wins Parking plans and builds depot-ready lots with fast chargers, queue lanes, cleaning bays, pickup zones and gated access. No robotaxi operator had announced Providence service as of October 2026, and Wins has no robotaxi client in Rhode Island.
190 Level 2 and 19 DC fast ports at 88 public stations, per Department of Energy data pulled Oct 13, 2026.
Yes, from the state. ChargeRI pays 80% of eligible costs for workplaces and public lots, up to $10,000 per Level 2 station and $60,000 per site, and up to $50,000 per DC fast station at public sites. We could not confirm a separate Rhode Island Energy commercial rebate.
Rhode Island Energy. It reviews the added load at each site, and DC fast chargers usually need a service upgrade.
Not for new chargers. The 30C credit cannot be claimed for charging property placed in service after June 30, 2026 (IRS, Instructions for Form 8911).
An electrical permit from the Department of Inspection and Standards, an electrician licensed by the Department of Labor and Training, NEC Article 625 compliance and accessible design per U.S. Access Board guidance.
By our estimate, 8–16 weeks for Level 2 on an existing panel and 26–52 weeks for DC fast charging that needs new service from Rhode Island Energy.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 13, 2026
- IRS, Instructions for Form 8911, checked Oct 13, 2026
- U.S. Access Board, EV charging guidance, checked Oct 13, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 13, 2026
- City of Providence, Department of Inspection and Standards, checked Oct 13, 2026
- RI Department of Labor and Training, Professional Regulation, checked Oct 13, 2026
- RI Office of Energy Resources, ChargeRI, checked Oct 13, 2026
- RI Office of Energy Resources, RI NEVI Program, checked Oct 13, 2026
- R.I. Gen. Laws § 45-24-69, Appeals to superior court, checked Oct 13, 2026
- Waymo, Back to Boston (Feb. 5, 2026), checked Oct 13, 2026
- Waymo, Updates, checked Oct 13, 2026
- BEA Regional Price Parities (via FRED RPPALL39300), checked Oct 13, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 13, 2026
Last updated

About the author
John Davis
Content Writer
John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.
Ready to Unlock Your Parking Revenue?
Get a free, no-obligation proposal. Tell us about your property and we'll show you what's possible.
Or call us directly at (970) 279-1744