EV AND ROBOTAXI CHARGING · AUSTIN, TX
EV Charger and Robotaxi Charging Installation in Austin, TX
Wins Parking designs, permits, builds and operates charging for Austin lots, from downtown towers to fleet yards along US 183. The city owns its utility, Austin Energy, which pays business rebates through Plug-In Austin, and Austin ended parking minimums in 2023, so stalls can become charging spaces without a code fight. Department of Energy records list 1,579 public Level 2 and 309 DC fast ports here.
- public Level 2 ports (AFDC)
- 1,579public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 309public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to AUS, the service airport
- 9 mito AUS, the service airport
Get a free EV charger quote in Austin
Austin by the numbers
No minimums
Austin ended parking minimums citywide in Nov. 2023; only accessible spaces are still required
City of Austin, Ordinance No. 20231102-028Checked Oct 14, 2026
1,579 L2 · 309 DC fast
Public charging ports in Austin, pulled Oct 14, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 14, 2026
Mar–Nov work season
Months with average lows at or above 50°F; 0.2 in. of snow and 122.8 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 14, 2026
98.1 cost index
Austin-Round Rock-San Marcos, TX Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities, 2024Checked Oct 14, 2026
AUS · 9 miles
Austin-Bergstrom International Airport, the service airport for Austin
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 14, 2026
The chargers
Which EV chargers suit Austin parking lots?
About 16% of Austin's public ports are DC fast, per AFDC data pulled Oct 14, 2026, so most new private sites here start with Level 2 for parked hours and add fast charging only where turnover pays for it.
Apartments, offices along the Domain and downtown garages are Level 2 sites. Fast charging fits rideshare and delivery drivers, airport-area rental returns and retail centers on the highways, where a 20-minute stop is the norm.
Our Austin EV charging station installation guide covers the service in general; this page adds Austin Energy's rules, the city data and the depot plan.
The depot
What does a Austin robotaxi charging depot need?
Austin hosts two: Waymo through Uber and Tesla Robotaxi, both carrying riders as of Oct 14, 2026.
A fleet depot here has to handle heat first: Camp Mabry averages 123 days a year at 90°F or hotter. That means shaded charging rows, chargers rated for high ambient temperatures, wide queue lanes off the street, cleaning bays and gated entry with cameras.
Because Austin has no parking minimums, an owner can dedicate a whole lot to a fleet lease without a variance. Our guides cover autonomous vehicle parking, future-proof parking design and the EV and AV deployment guide. See also robotaxi depot design in Austin.
The network
How many public EV chargers does Austin have?
As of Oct 14, 2026, AFDC lists 710 public stations in Austin with 1,579 Level 2 and 309 DC fast ports.
Austin has about one fast port for every five Level 2 ports, a higher share of fast charging than most cities this size, partly because Austin Energy built its own public network early.
Austin's row in our ports-by-metro table shows the trend.
Those 710 stations average 2.7 ports apiece, which says most public sites are small: a few Level 2 heads at an office, garage or store. A property that installs eight or twelve ports becomes one of the larger sites in its part of town.
The power
Which utility serves Austin chargers, and what does it offer?
Austin Energy, the city-owned utility. Plug-In Austin pays business rebates of up to $5,000 per charging station, and Austin Energy runs its own public charging network.
Because the utility answers to the City Council, its programs change by budget year; we confirm the current rebate terms before a design is final and apply before ordering equipment.
Capacity is checked first: Austin Energy reviews the load before any panel or transformer work is drawn.
The code
Which permits and codes apply to EV chargers in Austin?
Development Services publishes 7–25 business days for commercial plan review, while NEC Article 625 governs charger circuits and the U.S. Access Board covers reach and aisle rules.
Austin ended parking minimums citywide in November 2023, keeping only accessible spaces. That makes stall conversions simple, but the accessible charging space still has to be laid out correctly.
We place it first: level pad, access aisle and reachable controls.
The incentives
What EV charging incentives are open to Austin sites?
Austin Energy's Plug-In Austin rebate is worth up to $5,000 per station; Texas programs are listed on the AFDC state page.
A charger energized in Austin after June 30, 2026, cannot claim the federal 30C credit, per the IRS Instructions for Form 8911.
The rebate trims the cost; tenant demand and fleet leases carry the business case.
The budget
What does EV charger installation cost in Austin, and how long does it take?
Our estimate for twelve Austin Level 2 ports is $47,100 to $105,900 installed, and $196,000 to $589,000 for four DC fast ports, before the Austin Energy rebate.
Austin's BEA index is 98.1, slightly under the national average, so we scale national per-port costs and AFDC's installation guidance down a little. Limestone close to the surface can raise trenching costs on the west side.
Our schedule estimate: 8 to 16 weeks from permit to energized Level 2 where the panel has room, 26 to 52 weeks when fast chargers need a new utility service.
Per port, Austin works out to about $3,925 to $8,825 for Level 2 and $49,000 to $147,250 for a fast charger, by our estimate. The spread comes from the distance to the panel, how much concrete has to be cut and whether Austin Energy needs a new transformer.
What would chargers cost in Austin?
Wins Parking estimateCharger type
Installed cost
$23,500–$53,000
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Austin's BEA cost index of 98.1. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Austin chargers run day to day?
Day to day, our platform prices each Austin session, bills idle time after a grace period, monitors ports all night, tickets cars that block chargers and reports energy, uptime and revenue monthly.
Heat is the main wear factor, so units are chosen for it and inspected on a schedule. Remote resets clear most faults; a technician handles the rest. Owners get energy, uptime, revenue and citation totals every month.
See EV charging parking management for the operating model and Austin parking management for the wider lot service.
Camp Mabry's normals show a coldest-month low near 42°F and 9 months with average lows at or above 50°F, so trenching and pours can run most of the year. Heat, not cold, sets our inspection calendar in Austin.
The neighbors
How does Austin compare with nearby metros for EV charging?
Austin has 309 fast ports; Houston, about 146 miles southeast, has 639, and Dallas, about 182 miles north, has 233.
Austin is the only city in the table with a city-owned utility and no parking minimums. Houston and Dallas sit in the competitive ERCOT market, where wires companies deliver power that retail providers sell.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Austin, TX (this page) | Austin Energy | Austin Development Services Department | 7–25 business days | 1579 · 309 |
| Houston, TX | CenterPoint Energy (wires); retail providers sell the power | Houston Permitting Center | 15 business days | 946 · 639 |
| Dallas, TX | Oncor (wires); retail providers sell the power | Dallas Development Services | 15 days | 567 · 233 |
| Oklahoma City, OK | OG&E | OKC Development Services, Building & Trade Permits | Not published (Wins estimate: 3–6 weeks) | 122 · 152 |
| Baton Rouge, LA | Entergy Louisiana | Baton Rouge Permits and Inspections Division | Not published (Wins estimate: 3–6 weeks) | 108 · 51 |
| Tulsa, OK | Public Service Company of Oklahoma (PSO) | Tulsa Development Services Permit Center | Not published (Wins estimate: 3–6 weeks) | 136 · 139 |
Review times are published targets unless marked as a Wins estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.
FAQ
Austin EV and robotaxi charging: frequently asked questions
Yes. Plug-In Austin pays business rebates of up to $5,000 per charging station. We confirm the current terms before ordering equipment.
Waymo, through Uber, and Tesla Robotaxi both carry riders, per the companies' pages checked Oct 14, 2026. Wins has no robotaxi client in Texas.
No minimums apply: Austin ended them citywide in November 2023, so only accessible spaces are still required.
1,579 Level 2 and 309 DC fast ports at 710 public stations, per the Department of Energy on Oct 14, 2026.
Development Services publishes 7–25 business days for commercial plan review.
About $3,925 to $8,825 installed, by our estimate at Austin's BEA index of 98.1.
Wins Parking lays out lots for driverless fleets: shaded fast-charging rows, queue lanes, cleaning bays, rider pickup and gated access.
About $47,100 to $105,900 installed before rebates, by our estimate at Austin's BEA index of 98.1.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
- IRS, Instructions for Form 8911, checked Oct 14, 2026
- U.S. Access Board, EV charging guidance, checked Oct 14, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
- Tesla, Robotaxi support, checked Oct 14, 2026
- Austin Energy, business EV charging, checked Oct 14, 2026
- Austin Development Services Department, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Texas laws and incentives, checked Oct 14, 2026
- Waymo, Where we're going, checked Oct 14, 2026
- BEA Regional Price Parities, 2024, checked Oct 14, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026
Last updated

About the author
John Davis
Content Writer
John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.
Ready to Unlock Your Parking Revenue?
Get a free, no-obligation proposal. Tell us about your property and we'll show you what's possible.
Or call us directly at (970) 279-1744