On this page
Yes. NEVI funding is still available in many states in November 2026. The program started as $5 billion over five years. Congress rescinded just over $503 million across 30 states and territories in January 2026. Federal money covers up to 80% of eligible project costs. Open rounds now run in Washington, Pennsylvania and other states.
What is NEVI funding?
NEVI stands for National Electric Vehicle Infrastructure. It is a Federal Highway Administration formula program created by the Infrastructure Investment and Jobs Act on November 15, 2021. Each state gets a share based on its federal highway formula.
States do not build most stations themselves. They run competitive rounds. Charging companies apply, often with a property owner as the site host. The state reimburses up to 80% of eligible costs. Eligible costs include equipment, installation, network connection, operation, maintenance and data sharing.
Stations must be public. They must use open payment, not proprietary access. Most must sit on designated Alternative Fuel Corridors.
Is NEVI funding still available?
The program has had three turns since 2025.
- February 2025: FHWA suspended NEVI. A review found 84% of funds still unobligated.
- August 11, 2025: FHWA issued revised guidance. States got 30 days to file updated plans. States can now set station spacing on corridors and decide when their corridors are built out.
- January 2026: A federal budget law rescinded just over $503 million in NEVI funds across 30 states and territories.
The cuts hit states unevenly. Nevada lost $12.6 million, about a third of its $38 million award. Texas lost about $85 million in unobligated funds. Florida lost about $45 million.
The rest of the money is moving. Pennsylvania's five-year allocation is $171.5 million. North Carolina received $109 million. Both states awarded new rounds this fall.
NEVI funding by state: which rounds are open now?
Round dates change. Confirm every date on the state DOT page before you plan around it.
- Washington: Round 2 accepts proposals through October 20, 2027. WSDOT reviews the prior month's proposals every month. It plans to award up to $69 million to companies that install, operate and maintain DC fast charging.
- Pennsylvania: The western region closes November 20, 2026. Central and eastern regions close March 12, 2027. The southeastern round just awarded $37 million for 515 ports.
- North Carolina: NCDOT awarded $14.4 million to eight companies for 14 sites in September 2026. A later phase will fund community and rural chargers.
- Texas: The state has awarded $226 million for 321 new charging stations.
If your state is not listed, check its DOT electric vehicle page. Several states run rolling or regional rounds.
How much NEVI funding has been awarded?
National totals lag. By early 2025, more than $526 million had been obligated. Contracts covered nearly 4,000 DC fast-charging ports at 990 locations.
State results vary widely. Pennsylvania has 54 NEVI-funded stations built. That is more than double any other state. Arizona opened its first three federally funded fast-charging stations in October 2026.
Wins Parking: Congress pulled just over $503 million from NEVI across 30 states and territories, so site hosts should confirm their state's remaining balance before signing a host agreement (November 2026).
What NEVI requires of a site host
The federal rule is 23 CFR Part 680. A corridor site must meet these minimums:
- Four ports. At least four networked DC fast-charging ports that can charge four vehicles at once.
- 150 kW each. Each port must deliver at least 150 kW continuously. Power sharing is allowed if each port can still meet a 150 kW request.
- CCS connectors. Every port needs a permanently attached CCS Type 1 connector.
- 24/7 access. The site must be open to the public all day, every day, year-round.
- Greater than 97% uptime. Each port must average more than 97% uptime, measured monthly over the prior 12 months. Utility outages and scheduled maintenance are excluded.
- Open payment. Contactless credit and debit cards, plus a toll-free phone or SMS option. No membership requirement.
- ADA and Buy America. Accessible design and Buy America rules apply.
States add their own terms. Pennsylvania's community round requires at least two ADA-compliant spaces per station. Read your state's grant agreement for the operating term and site host certification.
Worked example: a gas station off an interstate in Washington
An owner has a gas station lot one exit off an interstate in Washington. A charging company offers to apply for NEVI money and use the lot.
Step 1: Confirm the corridor. Check that the road is a designated Alternative Fuel Corridor or a route the state now allows.
Step 2: Check the round. WSDOT reviews proposals monthly through October 20, 2027. The company files the proposal. The owner signs the site host certification.
Step 3: Size the site. Four 150 kW ports is the floor. Count at least four charging stalls plus access aisles. Ask the utility how much capacity the service can deliver and how long an upgrade takes.
Step 4: Do the match math. NEVI pays up to $80 of every $100 in eligible cost. Someone covers the other $20. Get the split in writing: the charging company, the owner, or both.
Step 5: Read the term. The site must hold greater than 97% uptime. Find out who pays for repairs, snow removal, lighting and lot maintenance. Find out what happens to the equipment when the agreement ends.
A hotel offered a NEVI charger asks the same questions. The answers sit in the host agreement, not the grant.
How Wins Parking handles NEVI site work
Wins Parking designs, builds and manages parking sites with EV charging. Wins Design & Build is our construction division. We work with owners and charging companies across the country.
- Design: We lay out charging stalls, ADA spaces, access aisles, lighting and signage. We plan circulation so charging stalls do not block parking or fuel lanes.
- Build: We handle trenching, conduit, pads, bollards, paving, striping and drainage. We plan snow storage so stalls stay open in winter.
- Manage: We run enforcement for charging-only stalls, LPR cameras, permits and revenue reporting. Clear stalls help a site hold its uptime target.
Learn more on our EV charging parking management page. See completed work on our case studies page. Planning for fleet and robotaxi charging? Read about autonomous vehicle parking. For one state's round in detail, see our article on Arizona's NEVI sites.
Sources: AFDC NEVI summary, 23 CFR Part 680, WSDOT NEVI grant, Atlas Public Policy.
Next step
Have a lot near a highway or a charging company offer on your desk? Call (970) 279-1744 or start at https://winsparking.com/contact.
Frequently asked questions
What does NEVI stand for?
NEVI stands for National Electric Vehicle Infrastructure. The NEVI Formula Program is run by the Federal Highway Administration and was created by the Infrastructure Investment and Jobs Act in November 2021. It sends formula funds to each state, and the states award that money to companies that build, operate and maintain public EV fast-charging stations.
NEVI funding eligibility
NEVI funding eligibility depends on the state round. Most states award NEVI funds to charging companies, and the property owner signs on as the site host. Stations must be public, use open payment, and in most cases sit on a designated Alternative Fuel Corridor. Eligible costs include chargers, installation, network connection, operation, maintenance and data sharing.
Can a private property owner apply for NEVI funding?
A private property owner usually takes part in NEVI as a site host, not as the lead applicant. Washington, for example, awards NEVI funds to companies that install, operate and maintain DC fast charging, and the site host signs a certification form. Owners should partner with a charging company and confirm the terms in their state's grant agreement.
What share of a NEVI project does the site host pay?
NEVI pays up to 80% of eligible project costs, so someone must cover at least 20%. The federal rule does not say whether that share falls on the charging company or the property owner. The split is set in the host agreement, so a site host should get the match amount and who pays it in writing before signing.
Does a NEVI charging station have to be open 24 hours?
Yes. Under 23 CFR 680.106(e), a NEVI-funded corridor charging station must be open to the public 24 hours a day, year-round. Each port must also average greater than 97% uptime over the prior 12 months, so the site host and operator need a plan for repairs, snow removal and lighting.