On this page
If you host public fast chargers in a robotaxi city, fleet cars will use them. You cannot simply ban them, but you can set prices, time rules and access tiers that protect your other drivers. The better move for many owners is to offer robotaxi operators a dedicated, contracted charging site instead.
What happened in San Diego
Waymo launched official service in San Diego in September 2026. By late October, local drivers told the Los Angeles Times they were waiting 30 minutes to an hour to plug in while robotaxis filled fast chargers. One driver described three Waymos at a four-stall station.
The stations drawing complaints were privately owned. Electrify America runs 13 stations in San Diego and more than 300 in California. It told the Times it has no formal partnership with Waymo. EVgo said its San Diego sites are open to all drivers, including autonomous vehicles.
Waymo said it posts staff at some public stations to plug in its cars and tries to keep them from bunching up. It also said that as a city's operations mature, it builds its own charging and uses dedicated sites first.
On Sept. 14, the San Diego City Council voted unanimously to ask the state for more local control over autonomous vehicles. The resolution also asks that charging hubs stay away from homes, schools and public safety sites. The city says autonomous vehicles can still use public stations and will pay the same fees as everyone else.
This is not only a California story. Tesla began Robotaxi service in Fort Worth on Nov. 2, its seventh city, according to the Fort Worth Report. The company has named San Antonio, Phoenix, Las Vegas and Jacksonville as next. Every new service area adds electric fleet cars that need power each day.
Why fleet cars change the math at a public site
A private driver might charge once or twice a week. A ride-hail fleet car can need a fast charge more than once a shift. That pattern changes three things for a site host.
- Utilization. Stalls that sat empty half the day can fill up. That can help revenue, but it can also push out the drivers your tenants and shoppers count on.
- Demand charges. The U.S. Department of Energy notes that utility bills for charging often include charges based on the highest 15-minute average use in a billing period. DC fast chargers are more likely to trigger those demand charges than Level 2 units. Several fleet cars charging at once can set a new peak.
- Wear. DOE says owners should budget up to $400 a year per charger for maintenance, and extended warranties for DC fast chargers can top $800 per charger per year. More sessions mean more cable handling and more connector wear.
None of this makes fleet charging bad. It means the price and the rules should match the load.
Who sets the rules at your chargers
Start with your contracts. Many owners host chargers that a network operator owns and runs. In that case, the network sets most pricing and access rules, and your lease or host agreement decides what you can change.
If you own the equipment, you have more control. DOE lists common pricing structures: per kWh, per session, by time, or by subscription. It also notes pricing can differ for members and non-members and by user. That flexibility is what lets a host treat a fleet differently from a shopper.
Check three documents before you act:
- Host or site agreement. Who sets prices, idle fees and access lists?
- Grant or incentive terms. Public funding may require open access or set uptime. Some programs, such as NEVI, also require data reporting.
- Local rules. Some cities limit charging hours or noise. Santa Monica's council ordered a Waymo charging provider to stop overnight operations after neighbors complained about noise.
Five tools to keep public stalls available
These are the levers owners and operators use most. Pick the ones your agreement allows.
- Time limits with overstay fees. DOE's workplace charging guidance gives an example: free charging for up to four hours, then a $10 per hour fee. Fast-charge sites usually use much shorter windows. Post the rule at the stall and in the app.
- Time-of-day pricing. Utility rates often vary by time of day. Hosts can pass that through with peak and off-peak prices. This can steer fleet charging to overnight hours when shoppers are gone.
- Access tiers. Networked stations can run member-only or open access. A host can reserve some stalls for tenants, employees or customers and leave others public.
- Stall count and signage. Mark which stalls are public, which are reserved and how long a car may stay. Clear signs cut disputes before they start.
- Data review. DOE notes most networks give hosts utilization data through an online portal. Pull it monthly. Look for repeat fleet sessions, peak demand and wait times.
Before you set any fee or tow rule, confirm it with your network and local law. Enforcement rules differ by city and state.
When to sell charging to the fleet instead
Robotaxi operators need reliable power near their service areas. Waymo has said it moves to dedicated charging as a market matures. EVgo told the Times it has run sites for autonomous-vehicle partners since 2020 and had 120 stalls set aside for those companies earlier this year.
That points to a second path for owners. Instead of competing with fleets for public stalls, a lot owner can host a separate, contracted fleet site. Questions to answer first:
- Location. Is the lot inside or near a robotaxi service area? San Diego's council asked that hubs stay away from homes, schools and public safety sites, so check what nearby uses could draw objections.
- Power. How much utility capacity is at the site, and how long would an upgrade take?
- Hours and noise. Can the site run overnight without bothering neighbors?
- Layout. Fleet cars need clear circulation, staging space and room for staff who plug in or clean cars.
- Contract terms. Who pays for equipment, power and upgrades? What happens if the operator leaves the market?
A fleet lease can turn a slow lot into steady income. It also moves fleet load off the public stalls your other drivers use.
How Wins Parking handles this work
Wins Parking designs, builds and manages parking with EV charging in mind. On the EV charging side, our teams plan charger layouts, install equipment and manage the stalls after opening. That includes pricing, time rules, signage, permits and enforcement.
For owners weighing a fleet deal, our autonomous-vehicle parking team reviews the site for depot or satellite charging use. We look at circulation, staging, power needs and nearby uses. Wins Design & Build handles paving, striping, drainage and construction. Our parking management services can then run the mixed site day to day.
See our approach in our case studies.
Next step
Robotaxi fleets are spreading city by city. If your site has public chargers, set the rules now, before the cars arrive.
Call (970) 279-1744 or start at https://winsparking.com/contact.
Frequently asked questions
Can a private charging station block robotaxis?
It depends on who owns and runs the station and on any grant terms. Network operators set most access rules. Grant-funded stations may have to stay open to all drivers. Check your host agreement and local law before restricting access.
Do robotaxis pay to charge at public stations?
Yes, where a fee applies. San Diego said autonomous vehicles using its public stations would pay the same fees as everyone else.
Why do fleet cars raise a site's electric bill?
Utility bills for charging often include demand charges tied to the highest 15-minute average use in a billing period. Several fast chargers running at once can set a higher peak.
Can a parking lot owner lease space to a robotaxi company for charging?
Yes. Operators such as Waymo say they move to dedicated charging as a market matures. Owners should review location, utility power, overnight noise, layout and contract terms first.
What is an overstay or idle fee?
It is a fee charged when a car stays in a charging stall past a set time. DOE's workplace charging guidance gives an example of free charging for four hours, then $10 per hour.