EV AND ROBOTAXI CHARGING · DENVER, CO
EV Charger and Robotaxi Charging Installation in Denver, CO
Wins Parking plans, permits, builds and operates EV charging for Denver owners, from LoDo and Cherry Creek garages to fleet yards along I-70. Colorado is Wins' home state, and Denver has some of its strongest incentives: Xcel Energy pays $2,200 per workplace Level 2 port. Minimums ended citywide in August 2025, Waymo serves riders, and the Department of Energy lists 1,411 Level 2 and 210 DC fast public ports.
- public Level 2 ports (AFDC)
- 1,411public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 210public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to DEN, the service airport
- 13 mito DEN, the service airport
Get a free EV charger quote in Denver
Denver by the numbers
No minimums
Minimums ended citywide Aug. 11, 2025; maximums apply within a quarter mile of rail stations
City and County of Denver, Modernizing Parking RequirementsChecked Oct 14, 2026
1,411 L2 · 210 DC fast
Public charging ports in Denver, pulled Oct 14, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 14, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 40.7 in. of snow and 64 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 14, 2026
105.8 cost index
Denver-Aurora-Centennial, CO Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities, 2024Checked Oct 14, 2026
DEN · 13 miles
Denver International Airport, the service airport for Denver
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 14, 2026
The chargers
Which EV chargers suit Denver parking lots?
Denver lists 1,411 public Level 2 and 210 DC fast ports in AFDC data pulled Oct 14, 2026; Level 2 is the workhorse for offices and apartments, and Xcel's per-port rebates make it the cheapest place to start.
Apartment towers around Union Station, Cherry Creek offices and the Anschutz and downtown hospital campuses suit Level 2. Fast charging fits fleets along the I-70 and I-25 corridors and rideshare drivers on the long run to DEN.
Our Denver EV charging station installation guide covers the service overall; this page holds Xcel's rebates, the city data and the depot plan.
The depot
What does a Denver robotaxi charging depot need?
Waymo serves Denver riders as of Oct 14, 2026, among the cities on its service list.
Denver averages 40.7 inches of snow at the city's normals station, so a depot here needs plowable layouts, covered or heated staging where budgets allow and chargers on raised pads clear of snow storage. The rest is standard: fast chargers matched to fleet miles, cleaning bays, a rider curb and gated, camera-covered entry.
Industrial land near I-70 and the airport corridor fits depots. Our guides cover autonomous vehicle parking, future-proof parking design and the EV and AV deployment guide. See also robotaxi depot design in Denver.
The network
How many public EV chargers does Denver have?
AFDC data from Oct 14, 2026 counts 493 public stations in Denver holding 1,411 Level 2 and 210 DC fast ports.
Denver has more public Level 2 ports than any neighbor in the comparison table below, yet apartment residents without garage charging still compete for them in the evening.
We refresh this figure monthly in the ports-by-metro research table.
The 493 stations average 3.3 ports, and fast chargers are about 13% of the total, so drivers on the long run to DEN still find more Level 2 than fast charging.
The power
Which utility serves Denver chargers, and what does it offer?
Xcel Energy pays $2,200 per workplace Level 2 port, up to $45,000 per DC fast charger, $8,800 per multifamily port and up to $31,200 per fast charger at community hubs.
The amounts depend on site type, so the same twelve ports could earn very different rebates at an office, an apartment building or a public hub. We confirm eligibility with Xcel before design and apply before equipment is ordered.
Xcel also reviews capacity first; a new transformer usually sets the start date.
The code
Which permits and codes apply to EV chargers in Denver?
Community Planning and Development commits to a 20-business-day review. NEC Article 625 is the national wiring standard for chargers, and the Access Board publishes the accessibility guidance.
Denver ended parking minimums citywide on Aug. 11, 2025, and maximums apply within a quarter mile of rail stations. Stall conversions are simple; the accessible space still needs care.
We place the accessible charger first: level pad, access aisle and reachable controls.
The incentives
What EV charging incentives are open to Denver sites?
Xcel's rebates lead, and Colorado's state programs are listed on the AFDC page.
Since June 30, 2026, the federal 30C credit has been closed to newly installed chargers, as the IRS Instructions for Form 8911 state.
Stacked with Xcel's per-port amounts, state programs can cover a large share of a workplace project.
The budget
What does EV charger installation cost in Denver, and how long does it take?
In Denver, twelve Level 2 ports run about $50,800 to $114,300 installed and four DC fast ports about $212,000 to $635,000, before Xcel's rebate, by our estimate.
Denver's BEA index is 105.8, above the national average. We scale national per-port costs and AFDC's installation guidance to it; winter concrete work costs more and can move pads to spring.
Our schedule estimate: 8 to 16 weeks from permit to energized Level 2 where the panel has room, 26 to 52 weeks when fast chargers need a new utility service.
Per port, Denver lands near $4,233 to $9,525 for Level 2 and $53,000 to $158,750 for fast charging before rebates, by our estimate. Xcel's $2,200 workplace rebate can cover roughly a quarter to half of a Level 2 port at those prices.
What would chargers cost in Denver?
Wins Parking estimateCharger type
Installed cost
$25,400–$57,100
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Denver's BEA cost index of 105.8. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Denver chargers run day to day?
Each Denver port reports to our operations team, which sets prices, applies idle fees after a short grace period, clears faults and enforces charging stalls, then sends owners a monthly summary.
Snow removal is part of the plan, with plow routes set around the chargers.
See EV charging parking management for the operating model and Denver parking management for the wider lot service.
The Denver Water normals station averages a coldest-month low near 21°F, and only 4 months average lows at or above 50°F. Denver's dry air and strong sun fade plastic housings and cables, so we pick UV-rated equipment and check it each spring. As a Colorado company, we know these winters from our own lots in the Vail Valley.
The neighbors
How does Denver compare with nearby metros for EV charging?
Denver's 1,411 Level 2 ports are more than double Salt Lake City's 522, about 378 miles west, per AFDC data pulled Oct 14, 2026.
Rapid City, Wichita, Lincoln and Omaha each have their own utilities and smaller networks; Denver is the only city in the table where a driverless service carries riders.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Denver, CO (this page) | Xcel Energy | Denver Community Planning and Development | 20 business days | 1411 · 210 |
| Rapid City, SD | Black Hills Energy | Rapid City Building Services | Not published (Wins estimate: 3–6 weeks) | 24 · 11 |
| Salt Lake City, UT | Rocky Mountain Power | Salt Lake City Building Services | 30 days | 522 · 109 |
| Wichita, KS | Evergy | Metropolitan Area Building and Construction Department (MABCD) | Not published (Wins estimate: 3–6 weeks) | 67 · 41 |
| Lincoln, NE | Lincoln Electric System (LES) | Lincoln Building and Safety | Not published (Wins estimate: 3–6 weeks) | 72 · 39 |
| Omaha, NE | Omaha Public Power District (OPPD) | Omaha Permits and Inspections | Not published (Wins estimate: 3–6 weeks) | 157 · 86 |
Review times are published targets unless marked as a Wins estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.
FAQ
Denver EV and robotaxi charging: frequently asked questions
$2,200 per workplace Level 2 port, up to $45,000 per DC fast charger, $8,800 per multifamily port and up to $31,200 per community-hub fast charger.
Yes. Waymo lists Denver among the cities it serves, as of Oct 14, 2026. Wins has no robotaxi client in Colorado.
1,411 Level 2 and 210 DC fast ports at 493 public stations, per the Department of Energy on Oct 14, 2026.
Community Planning and Development commits to a 20-business-day review.
No. They ended citywide on Aug. 11, 2025; maximums apply near rail stations.
Yes. Wins is headquartered in Edwards, Colorado. It has no Denver office, crew or charging client, and prices each Denver job after a site visit.
About $4,233 to $9,525 installed before rebates, by our estimate; Xcel's $2,200 workplace rebate comes off that.
About $212,000 to $635,000 for four ports before Xcel's rebate, by our estimate.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
- IRS, Instructions for Form 8911, checked Oct 14, 2026
- U.S. Access Board, EV charging guidance, checked Oct 14, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
- Xcel Energy, business EV charging, checked Oct 14, 2026
- Denver Community Planning and Development, checked Oct 14, 2026
- Denver Community Planning and Development, published review target, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Colorado laws and incentives, checked Oct 14, 2026
- Waymo, Where we're going, checked Oct 14, 2026
- BEA Regional Price Parities, 2024, checked Oct 14, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026
Last updated

About the author
John Davis
Content Writer
John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.
Ready to Unlock Your Parking Revenue?
Get a free, no-obligation proposal. Tell us about your property and we'll show you what's possible.
Or call us directly at (970) 279-1744