John Davis, Content Writer at Wins ParkingWritten by , Content WriterUpdated October 2026Reviewed by Ross D. Blankenship, Managing Principal.

Wins Parking designs, permits, builds and operates EV charging for Baltimore owners, from Inner Harbor and Harbor East garages to industrial yards near the port and BWI. Baltimore repealed per-use parking minimums in 2025, and Waymo lists the city as up next after manual driving began in December 2025. The Department of Energy counts 654 public Level 2 and 134 DC fast ports in the city.

public Level 2 ports (AFDC)
654public Level 2 ports (AFDC)
public DC fast ports (AFDC)
134public DC fast ports (AFDC)
last day to place in service for the 30C credit
June 30, 2026last day to place in service for the 30C credit
to BWI, the service airport
9 mito BWI, the service airport

Get a free EV charger quote in Baltimore

Free Baltimore quote · Step 1 of 3

What does your Baltimore lot need?

Pick one to start. We reply within 2 hours during business hours.

BWI
Baltimore · 9 miles from BWI

Baltimore by the numbers

The chargers

Which EV chargers suit Baltimore parking lots?

Baltimore lists 654 public Level 2 and 134 DC fast ports in AFDC data pulled Oct 14, 2026; Level 2 suits garages, hospital decks and offices, and fast charging suits fleets near I-95 and the port.

Harbor East and Inner Harbor garages, the hospital campuses and apartments near the universities suit Level 2, since cars sit for hours. Fast charging fits the port and industrial belt in the southeast, delivery fleets along I-95 and rideshare staging toward BWI.

Baltimore has no earlier Wins EV service guide, so this page is the main reference for the city.

Many Baltimore neighborhoods are rowhouse blocks with street parking, so drivers who go electric depend on garages and lots near home. An apartment or office garage that opens a few Level 2 ports to overnight monthly parkers fills a real gap.

Level 22.9–19.2 kWWorkplace, multifamily, retail · about 25 miles of range per hourDC fastUp to 500 kWFleets, corridors, robotaxi depots · about 100–200+ miles in 30 minutes
Power range, typical use and range added while charging. Source: DOE Alternative Fuels Data Center.

The depot

What does a Baltimore robotaxi charging depot need?

Waymo lists Baltimore under "Up next" as of Oct 14, 2026, and CNBC reported in December 2025 that manual driving had begun in the city.

A depot needs fast chargers sized to fleet miles, staging off the street, cleaning bays, a rider curb and gated, camera-covered entry. With 34 days a year at 90°F or hotter at BWI, shaded charging rows help in summer.

Industrial land near the port and along I-95 is the likely depot zone. Our guides cover autonomous vehicle parking, future-proof parking design and the EV and AV deployment guide.

Gate + plate readerQueue lanesDC fast chargersCleaning + turnaround baysPickup +drop-offAI cameras
What a robotaxi charging depot needs, as a diagram. Not a drawing of any Wins Parking project.

The network

How many public EV chargers does Baltimore have?

As of Oct 14, 2026, AFDC lists 237 public stations in Baltimore with 654 Level 2 and 134 DC fast ports.

Rowhouse blocks dominate much of the city, and many residents park on the street with no home outlet. That makes public and workplace Level 2 more important here than in suburban counties.

Month-by-month figures sit in our EV charging ports by metro research.

About 17% of the city's public ports are fast chargers, and the 237 stations average 3.3 ports each. Few sites are large, which leaves room for a garage that installs a full row.

The power

Which utility serves Baltimore chargers, and what does it offer?

BGE serves Baltimore and lists no open commercial charger rebate as of Oct 14, 2026; it runs its own public charging network.

Without a rebate, BGE's role is the capacity review and service connection. We send load data before design, since a new transformer usually sets the start date.

We watch BGE and Maryland programs for new funding.

The code

Which permits and codes apply to EV chargers in Baltimore?

The Department of Housing and Community Development issues building permits. Wiring follows NEC Article 625, and accessible stalls follow U.S. Access Board guidance.

DHCD publishes no target for this work, so we budget 8–12 weeks, a Wins estimate. Ordinance 25-064 repealed per-use minimums in 2025 and set maximums, so stall conversions need no variance.

Baltimore publishes no review target for this work, so we plan on 8 to 12 weeks, a Wins estimate, and start the BGE service request in parallel so the two clocks overlap.

The incentives

What EV charging incentives are open to Baltimore sites?

Maryland programs are listed on the AFDC state page; BGE has no open commercial rebate.

Federal 30C is off the table for new work: the Form 8911 instructions cut it off for property placed in service after June 30, 2026.

Tenant demand in apartments and offices drives most Baltimore projects.

Maryland's state programs, listed on the AFDC page, change often, so we look again at proposal and once more before equipment is ordered.

The budget

What does EV charger installation cost in Baltimore, and how long does it take?

Twelve Baltimore Level 2 ports run about $50,200 to $112,900 installed and four DC fast ports about $209,000 to $627,000, by our estimate.

Baltimore's BEA index of 104.5 sits a little above the national average, so we scale national per-port costs and AFDC's installation guidance up slightly. Older garages may need new conduit runs.

Expect roughly 8–16 weeks for a Level 2 job on spare capacity and 26–52 for a fast-charging job with new service, after permits, by our estimate.

One Baltimore Level 2 port runs about $4,183 to $9,408 installed and one fast port about $52,250 to $156,750, by our estimate at the BEA index of 104.5. Older garages often need new conduit along the ceiling and a panel upgrade, which is where most of that range comes from.

What would chargers cost in Baltimore?

Wins Parking estimate

Charger type

Installed cost

$25,100–$56,400

Signed scope to energized

8–16 weeks

A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Baltimore's BEA cost index of 104.5. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.

The day to day

How are Baltimore chargers run day to day?

We operate Baltimore sites remotely and on foot: dynamic session pricing, idle fees once the grace period ends, 24-hour fault alerts, stall enforcement and a monthly statement for the owner.

Game days at Camden Yards and M&T Bank Stadium can fill nearby ports, so pricing can rise at peak.

The Baltimore parking management page covers gates and enforcement; EV charging parking management covers the charging side.

BWI's normals show a coldest-month low near 25°F and 19.3 inches of snow a year, so we set pedestals clear of plow paths and check cable management before winter. Only 5 months average lows at or above 50°F, and we prefer to pour pads in them.

The neighbors

How does Baltimore compare with nearby metros for EV charging?

Baltimore has 654 Level 2 ports; Washington, DC, about 35 miles southwest, has 1,030, per AFDC data pulled Oct 14, 2026.

Both cities are on Waymo's up-next list, and neither BGE nor Pepco lists an open charger rebate.

EV charging in Baltimore and 5 nearby cities: utility, permit office, review time and public ports, checked Oct 14, 2026
CityElectric utilityPermit officeReview timePublic ports (L2 · DC fast)
Baltimore, MD (this page)BGEBaltimore City Department of Housing and Community DevelopmentNot published (Wins estimate: 8–12 weeks)654 · 134
Washington, DCPepcoDC Department of Buildings30 business days1030 · 60
Dover, DECity of Dover ElectricDover Planning and InspectionsNot published (Wins estimate: 3–6 weeks)35 · 29
Wilmington, DEDelmarva PowerWilmington Licenses and InspectionsNot published (Wins estimate: 3–6 weeks)83 · 22
Philadelphia, PAPECOPhiladelphia Department of Licenses and Inspections20 business days378 · 144
Newark, NJPSE&GNewark Office of the Uniform Construction Code20 business days113 · 42

Review times are published targets unless marked as a Wins estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.

FAQ

Baltimore EV and robotaxi charging: frequently asked questions

Waymo lists Baltimore as up next, as of Oct 14, 2026, and manual driving began in December 2025. Wins has no robotaxi client in Maryland.

Sources

  1. DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
  2. DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
  3. DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
  4. IRS, Instructions for Form 8911, checked Oct 14, 2026
  5. U.S. Access Board, EV charging guidance, checked Oct 14, 2026
  6. NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
  7. CNBC, Waymo manual driving in Baltimore, Pittsburgh and St. Louis (Dec. 2025), checked Oct 14, 2026
  8. BGE, business EV charging, checked Oct 14, 2026
  9. Baltimore City Department of Housing and Community Development, checked Oct 14, 2026
  10. DOE Alternative Fuels Data Center, Maryland laws and incentives, checked Oct 14, 2026
  11. Waymo, Where we're going, checked Oct 14, 2026
  12. BEA Regional Price Parities, 2024, checked Oct 14, 2026
  13. NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026

Last updated

John Davis, Content Writer at Wins Parking

About the author

John Davis

Content Writer

John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.

Ready to Unlock Your Parking Revenue?

Get a free, no-obligation proposal. Tell us about your property and we'll show you what's possible.

Or call us directly at (970) 279-1744