EV AND ROBOTAXI CHARGING · HOUSTON, TX
EV Charger and Robotaxi Charging Installation in Houston, TX
Wins Parking plans, permits, builds and operates EV charging for Houston owners, from Texas Medical Center garages to port-area fleet yards. Department of Energy records list 639 public DC fast ports in Houston against 946 Level 2, a high fast share, and Waymo and Tesla Robotaxi both carry riders. CenterPoint Energy delivers the power; retail providers sell it.
- public Level 2 ports (AFDC)
- 946public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 639public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to IAH, the service airport
- 14 mito IAH, the service airport
Get a free EV charger quote in Houston
Houston by the numbers
Minimums by use
Off-street minimums by use citywide
City of Houston Planning, Off-Street Parking OrdinanceChecked Oct 14, 2026
946 L2 · 639 DC fast
Public charging ports in Houston, pulled Oct 14, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 14, 2026
Mar–Nov work season
Months with average lows at or above 50°F; 0.1 in. of snow and 111.3 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 14, 2026
98.6 cost index
Houston-Pasadena-The Woodlands, TX Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities, 2024Checked Oct 14, 2026
IAH · 14 miles
George Bush Intercontinental Airport, the service airport for Houston
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 14, 2026
The chargers
Which EV chargers suit Houston parking lots?
Houston's public network is unusually fast-heavy: 639 of its 1,585 ports, about 40%, are DC fast in AFDC data pulled Oct 14, 2026, so Level 2 at workplaces and apartments is where the gap is.
Medical Center staff garages, Energy Corridor campuses and Galleria-area apartments need Level 2. Fast charging fits fleets near the Port of Houston and the airports, plus retail along the beltways where drivers stop briefly.
Our general Houston EV charging station installation guide covers the service; here are the city data, the utility setup and the flood and depot planning.
The depot
What does a Houston robotaxi charging depot need?
Waymo and Tesla Robotaxi both carry Houston riders as of Oct 14, 2026.
A Houston depot has two design drivers: 111 days a year at 90°F or hotter, and flooding. Chargers, switchgear and transformers go on raised pads above the site's flood elevation, with shade over the charging rows, wide staging lanes, cleaning bays and secured entry.
Large parcels near the beltways and the airports suit depots. Our guides cover autonomous vehicle parking, future-proof parking design and the EV and AV deployment guide. See also robotaxi depot design in Houston.
The network
How many public EV chargers does Houston have?
AFDC data from Oct 14, 2026 lists 404 public stations in Houston with 946 Level 2 and 639 DC fast ports.
That is about two fast ports for every three Level 2, a far higher fast share than most large cities. Long drives and large retail lots favor quick stops, but apartments and offices still have too few Level 2 ports for all-day parking.
The EV charging ports database tracks Houston's count month by month.
The 404 stations average 3.9 ports. The fast-charging share reflects big highway and retail sites; residents of apartments without assigned spaces still have few Level 2 options near home.
The power
Which utility serves Houston chargers, and what does it offer?
CenterPoint Energy delivers the power and no commercial charger program is listed; owners buy energy from a retail electric provider.
As in Dallas, the ERCOT split means a service request with CenterPoint and a rate chosen from a retailer. Fleet sites often benefit from plans with cheap overnight energy.
Many Houston owners also ask about backup power after long storm outages; we can plan space for batteries or a generator, priced separately.
The code
Which permits and codes apply to EV chargers in Houston?
The Houston Permitting Center targets 15 business days for commercial review; NEC Article 625 sets the wiring rules and the U.S. Access Board the accessible-space guidance.
Houston has no zoning, but it does set off-street parking minimums by use in Chapter 26. Converting stalls must keep the count legal, so we check before drawing.
In flood-prone areas, floodplain rules decide equipment height. The accessible charger is placed first.
Houston has no zoning code, but deed restrictions and the city's off-street parking rules still apply, so we read both before converting stalls.
The incentives
What EV charging incentives are open to Houston sites?
With no CenterPoint rebate, Houston projects use the Texas programs on the AFDC state page and retail time-of-use plans.
Owners here can no longer plan on 30C; the IRS Instructions for Form 8911 end it for chargers placed in service after June 30, 2026.
Fleet leases and tenant demand drive most Houston projects.
With no CenterPoint program, Texas programs on the AFDC page and a retail plan's off-peak pricing are where the savings come from.
The budget
What does EV charger installation cost in Houston, and how long does it take?
Twelve Houston Level 2 ports run about $47,300 to $106,500 installed and four DC fast ports about $197,000 to $592,000, by our estimate.
Houston's BEA index of 98.6 sits slightly under the national average. We scale national per-port costs and AFDC's installation guidance to it; raised pads in floodplains add cost.
Expect roughly 8–16 weeks for a Level 2 job on spare capacity and 26–52 for a fast-charging job with new service, after permits, by our estimate.
Per port, Houston comes to about $3,942 to $8,875 for Level 2 and $49,250 to $148,000 for fast charging at the BEA index, by our estimate. Raised pads in flood-prone areas and soft clay soils add cost; so does waiting on CenterPoint for a new transformer.
What would chargers cost in Houston?
Wins Parking estimateCharger type
Installed cost
$23,700–$53,200
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Houston's BEA cost index of 98.6. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Houston chargers run day to day?
Houston chargers run on the same software as our gates: we set session prices, start idle fees after a grace period, watch every port around the clock, enforce charging-only stalls and send a monthly report.
Storm season adds a step: before a named storm we can shut down chargers remotely and inspect them after.
The Houston parking management page covers gates and enforcement; EV charging parking management covers the charging side.
Bush Intercontinental's normals show 111 days a year at 90°F or hotter and a coldest-month low near 44°F. Heat and humidity work on connectors and cooling fans, so we inspect them on a summer schedule and keep spare parts close.
The neighbors
How does Houston compare with nearby metros for EV charging?
Houston's 639 fast ports lead the table; Austin, about 146 miles west, has 309.
Baton Rouge and New Orleans have their own utilities outside ERCOT, and Austin has a city-owned utility, so Houston's wires-and-retailer setup is shared only with Dallas among nearby metros.
Dallas, about 223 miles north, shares the Texas retail power market but runs on Oncor's wires instead of CenterPoint's.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Houston, TX (this page) | CenterPoint Energy (wires); retail providers sell the power | Houston Permitting Center | 15 business days | 946 · 639 |
| Austin, TX | Austin Energy | Austin Development Services Department | 7–25 business days | 1579 · 309 |
| Dallas, TX | Oncor (wires); retail providers sell the power | Dallas Development Services | 15 days | 567 · 233 |
| Baton Rouge, LA | Entergy Louisiana | Baton Rouge Permits and Inspections Division | Not published (Wins estimate: 3–6 weeks) | 108 · 51 |
| New Orleans, LA | Entergy New Orleans | New Orleans Department of Safety and Permits | Not published (Wins estimate: 3–6 weeks) | 114 · 12 |
| Jackson, MS | Entergy Mississippi | Jackson Office of Code Services | Not published (Wins estimate: 3–6 weeks) | 31 · 43 |
Review times are published targets unless marked as a Wins estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.
FAQ
Houston EV and robotaxi charging: frequently asked questions
Waymo and Tesla Robotaxi, per the companies' pages checked Oct 14, 2026. Wins has no robotaxi client in Texas.
No commercial charger program is listed. CenterPoint delivers power; owners buy energy from a retail provider.
946 Level 2 and 639 DC fast ports at 404 public stations, per the Department of Energy on Oct 14, 2026.
The Houston Permitting Center targets 15 business days for commercial review.
Yes. Chapter 26 of the city code sets off-street minimums by use citywide.
Equipment goes on raised pads above the site's flood elevation, and chargers can be shut down remotely before a storm.
Bush Intercontinental averages 111 days a year at 90°F or hotter, so we choose heat-rated units and inspect cooling parts each summer.
About $47,300 to $106,500 for twelve ports installed, by our estimate at Houston's BEA index of 98.6.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
- IRS, Instructions for Form 8911, checked Oct 14, 2026
- U.S. Access Board, EV charging guidance, checked Oct 14, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
- Tesla, Robotaxi support, checked Oct 14, 2026
- CenterPoint Energy, business EV charging, checked Oct 14, 2026
- Houston Permitting Center, checked Oct 14, 2026
- Houston Permitting Center, published review target, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Texas laws and incentives, checked Oct 14, 2026
- Waymo, Where we're going, checked Oct 14, 2026
- BEA Regional Price Parities, 2024, checked Oct 14, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026
Last updated

About the author
Ross D. Blankenship
Managing Principal
Ross D. Blankenship is Managing Principal of Wins Parking. He has filed 20 U.S. patent applications on autonomous vehicle parking and charging, EV charging hubs and drone safety, all patent pending. He holds a JD from Washington University School of Law and a BA from Cornell University, and is the author of five books on AI and property.