EV AND ROBOTAXI CHARGING · MADISON, WI
EV Charger and Robotaxi Charging Installation in Madison, WI
Wins Parking plans, permits, installs and runs EV chargers and fleet charging lots for Madison properties. Federal data count 260 public Level 2 and 81 DC fast ports in Madison, the most of any city in Wisconsin we track. Madison Gas and Electric has proposed a commercial charging allowance to state regulators, and we check its status for each project.
- public Level 2 ports (AFDC)
- 260public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 81public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to MSN, the service airport
- 6 mito MSN, the service airport
Get a free EV charger quote in Madison
Madison by the numbers
None downtown
No minimums in Downtown and Central districts or several mixed-use and TOD districts
Madison Zoning Code, §28.141 (Parking and Loading Standards)Checked Oct 14, 2026
260 L2 · 81 DC fast
Public charging ports in Madison, pulled Oct 14, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 14, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 51.8 in. of snow and 8.6 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 14, 2026
97.3 cost index
Madison, WI Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities, 2024Checked Oct 14, 2026
MSN · 6 miles
Dane County Regional Airport, the service airport for Madison
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 14, 2026
The chargers
What EV chargers does Wins install in Madison?
Level 2 units at 2.9 to 19.2 kW, per the Department of Energy, for long stays, and DC fast units up to 500 kW, adding 100 to 200+ miles in roughly 30 minutes.
Isthmus apartments, state and office garages, UW-area housing, hospital staff lots and west-side office parks are Level 2 sites. Fast charging suits retail on the Beltline, stops near I-39/90 and delivery fleets.
We design, permit, build and operate, and charging income lands in the parking report.
The depot
What would a robotaxi charging depot in Madison need?
Fast chargers sized to fleet miles, an MGE capacity plan, a queue off the street, heated cleaning bays, a rider curb, gated entry and cameras. As of Oct 14, 2026, no operator had announced Madison.
Robotaxi Report's city tracker lists Minneapolis, about 230 miles northwest, as planned or testing, the closest tracked activity we found. Wins has no robotaxi work in Wisconsin.
An owner rebuilding now can reserve transformer space, a queue lane, an indoor bay and a rider curb. Our autonomous vehicle parking, future-proof design and EV and AV deployment guides explain how.
The network
How many public EV chargers does Madison have?
260 Level 2 and 81 DC fast ports at 122 public stations with Madison addresses, per Department of Energy data pulled Oct 14, 2026.
Suburbs add more: Sun Prairie lists 30 Level 2 and 8 fast ports, and Middleton 11 and 8. Janesville, on I-39/90 to the south, has 52 fast ports along the interstate.
Madison's row in our EV charging ports database updates monthly from the same source.
The power
Which utility serves Madison chargers, and what has it proposed?
Madison Gas and Electric serves most of Madison. It has filed with the Public Service Commission for a Commercial EV Charging Allowance of $300 per kW on certain commercial rates, capped at 5 MW and $1.5 million in total, and it offers EV fleet analysis.
Because the allowance was filed as a proposal, we check whether it has been approved and what its terms are before counting on it. Some addresses on the edges are served by other utilities, which we confirm first.
MGE reviews whether service can carry the load and designs any upgrade. That request starts on day one.
The code
Which permits and codes apply to EV chargers in Madison?
An electrical permit from the Building Inspection Division, a DSPS-licensed contractor, wiring to NEC Article 625 and an accessible space per the U.S. Access Board's guidance.
In districts with no minimum, stalls can become charging spaces freely; elsewhere we check §28.141 first. A transformer pad may need plan review. Madison lists no review target; we plan three to six weeks, an estimate.
The accessible space is placed first, with level ground, a side aisle and reachable controls.
The incentives
What EV charging incentives are available to Madison sites?
MGE's proposed allowance, if approved, and WisDOT's WEVI program, which made 53 conditional NEVI awards in May 2024 for corridor fast charging. For federal taxes, the 30C credit is unavailable for chargers placed in service after June 30, 2026 (IRS, Instructions for Form 8911).
WEVI sites sit on designated corridors like I-39/90 and I-94, so a travel stop might fit a later round while a campus garage would not. The IRS instructions set the 30C cutoff.
In Madison, strong EV adoption often makes the case on demand alone.
The budget
What does EV charger installation cost in Madison, and how long does it take?
By our estimate, eight Level 2 ports cost about $31,100 to $70,100 installed in Madison and two DC fast ports about $97,000 to $292,000.
Isthmus garages can be tight for conduit runs; suburban surface lots spend more on trenching. Fast charging usually needs new MGE service.
Level 2 on an existing panel takes 8–16 weeks and fast charging on new service 26–52 weeks, by our estimate. We scale national per-port costs and AFDC's installation guidance by Madison's BEA index of 97.3.
What would chargers cost in Madison?
Wins Parking estimateCharger type
Installed cost
$23,400–$52,500
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Madison's BEA cost index of 97.3. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Madison chargers run day to day?
From our parking platform: Wins sets prices, adds idle fees after a grace period, monitors ports at all hours, cites gas cars in EV stalls and reports charging with parking.
At apartment buildings, residents pay through their parking accounts, and idle fees rotate cars so more residents get a turn. Faults reach our operations desk for a remote reset or a technician. Reports show energy, uptime, revenue and citations.
This is our EV charging parking management service, paired with parking management in Madison.
The neighbors
How does Madison compare with nearby cities for EV charging?
Madison's 260 Level 2 and 81 fast ports lead the region; Milwaukee, 74 miles east, has 135 and 33, per AFDC data pulled Oct 14, 2026.
Utilities vary: MGE in Madison and Middleton, Sun Prairie's municipal utility, Alliant Energy in Janesville and We Energies in Milwaukee.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Madison, WI (this page) | Madison Gas and Electric (MGE) | Madison Building Inspection Division | Not published (Wins estimate: 3–6 weeks) | 260 · 81 |
| Middleton, WI | Madison Gas and Electric (MGE) | City of Middleton | Not published (Wins estimate: 3–6 weeks) | 11 · 8 |
| Sun Prairie, WI | Sun Prairie Utilities | City of Sun Prairie | Not published (Wins estimate: 3–6 weeks) | 30 · 8 |
| Janesville, WI | Alliant Energy | City of Janesville | Not published (Wins estimate: 3–6 weeks) | 24 · 52 |
| Milwaukee, WI | We Energies | Milwaukee Department of Neighborhood Services | Not published (Wins estimate: 3–6 weeks) | 135 · 33 |
| Oshkosh, WI | Utility varies by address | City of Oshkosh | Not published (Wins estimate: 3–6 weeks) | 8 · 12 |
These permit offices publish no turnaround for commercial electrical work, so each review time is a Wins Parking estimate. Ports: AFDC, public and open, pulled Oct 14, 2026.
FAQ
Madison EV and robotaxi charging: frequently asked questions
Wins Parking does. We design, permit, install and run Level 2 chargers for Madison apartment owners, with resident billing through the parking system. A Level 2 port runs about $4,000–$9,000 installed at U.S. average prices, our estimate.
Wins Parking plans depot-ready lots with fast charging, an off-street queue, heated cleaning bays, a pickup curb and gated access. No robotaxi operator had announced Madison as of October 2026, and Wins has no robotaxi client in Wisconsin.
260 Level 2 and 81 DC fast ports at 122 public stations, per Department of Energy data pulled Oct 14, 2026.
MGE has filed a proposed Commercial EV Charging Allowance of $300 per kW with the Public Service Commission. We check whether it has been approved before including it in a budget.
WisDOT's WEVI program funds corridor fast charging with federal NEVI money; 53 conditional first-round awards were made in May 2024.
Not for new chargers; the IRS Instructions for Form 8911 exclude property placed in service after June 30, 2026.
An electrical permit from the Building Inspection Division, a DSPS-licensed contractor, NEC Article 625 wiring and an accessible space following U.S. Access Board guidance.
About 8–16 weeks for Level 2 on existing service and 26–52 weeks for fast charging on new MGE service, by our estimate.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 14, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 14, 2026
- IRS, Instructions for Form 8911, checked Oct 14, 2026
- U.S. Access Board, EV charging guidance, checked Oct 14, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 14, 2026
- MGE, Proposed commercial EV charging pilot, checked Oct 14, 2026
- WisDOT, Wisconsin Electric Vehicle Infrastructure (WEVI), checked Oct 14, 2026
- Wisconsin DSPS, Electrical contractor, checked Oct 14, 2026
- City of Madison, Building Inspection Division, checked Oct 14, 2026
- Robotaxi Report, Robotaxi cities 2026, checked Oct 14, 2026
- BEA Regional Price Parities, 2024, checked Oct 14, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 14, 2026
Last updated

About the author
John Davis
Content Writer
John Davis is the Content Writer at Wins Parking. He writes the Wins Parking blog and the site's parking guides, cost guides and planning resources on parking design, construction, management and EV charging. John also works on Wins Parking's senior leadership projects.