EV AND ROBOTAXI CHARGING · BURLINGTON, VT
EV Charger and Robotaxi Charging Installation in Burlington, VT
Wins Parking designs, permits, installs and runs EV chargers and fleet charging depots on Burlington lots. The city has 171 public Level 2 ports but only 8 DC fast ports, per the Department of Energy. Burlington Electric Department lists a $2,500-per-port rebate for workplace chargers; we estimate a Level 2 port at $4,000–$9,000 installed.
- public Level 2 ports (AFDC)
- 171public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 8public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to BTV, the service airport
- 4 mito BTV, the service airport
Get a free EV charger quote in Burlington
Burlington by the numbers
No minimums
Minimums repealed citywide in 2023; maximums cap new parking
Burlington Comprehensive Development Ordinance, Article 8Checked Oct 13, 2026
171 L2 · 8 DC fast
Public charging ports in Burlington, pulled Oct 13, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 13, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 87.5 in. of snow and 8.2 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 13, 2026
100.9 cost index
Burlington-South Burlington, VT Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities (via FRED RPPALL15540)Checked Oct 13, 2026
BTV · 4 miles
Patrick Leahy Burlington International Airport, the service airport for Burlington
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 13, 2026
The chargers
What EV chargers does Wins install for Burlington parking lots?
Level 2 chargers, which AFDC rates at 2.9 to 19.2 kW on 208- or 240-volt service, and DC fast chargers, which deliver up to 500 kW and add roughly 100 to 200+ miles of range in 30 minutes.
In Burlington, Level 2 fits most sites: apartment buildings in the Old North End and the South End, hospital and university lots, downtown offices and hotels, where cars sit for hours. DC fast charging fits the few places drivers stop briefly: retail on Shelburne Road and Pine Street, fleet yards, and sites near Interstate 89. Many owners start with four to eight Level 2 ports and add a fast charger once the power is in.
We design the layout, permit it, install the EV charging stations and run them. The chargers sit on the same platform as our plate-reading gates and AI cameras, so an EV charger is one more space in the lot's system, not another vendor with its own app.
The depot
What does a robotaxi charging depot in Burlington need?
The same pieces as anywhere (high-power DC chargers, a power plan with the utility, queue lanes, cleaning bays, a pickup zone, access control and cameras), though no robotaxi operator had announced Burlington service when we checked on Oct 13, 2026.
We name no operator here because none has announced service in Burlington, and we have no robotaxi project in the city. What we can do now is plan lots so they don't have to be rebuilt later. A site that may host autonomous fleet charging needs room for DC fast chargers sized to the fleet's duty cycle, staging lanes that keep waiting cars off the street, a bay for cleaning between rides and a pickup zone apart from the charging rows. Delivery vans and municipal fleets need the same layout today.
Vermont winters shape the design: lanes wide enough to plow, somewhere for nearly 90 inches of snow to go, covered or heated cleaning bays and camera housings that shed ice. Our autonomous vehicle parking overview, the future-proof lot design guide and the EV and AV deployment guide carry the full checklist.
The network
How many public EV charging ports does Burlington have?
171 Level 2 and 8 DC fast ports at 100 public stations with Burlington street addresses, from the Department of Energy's station data pulled Oct 13, 2026.
That is about 21 Level 2 ports for every fast port, a wider gap than in nearby South Burlington or Plattsburgh. For a lot owner it means two things. Level 2 is common enough that a few slow chargers won't set a lot apart unless they're paired with good parking. A DC fast charger, on the other hand, fills a real gap for drivers passing through and for rideshare and delivery drivers who can't wait hours.
The EV charging ports database tracks these counts and refreshes them each month.
The power
Which utility serves Burlington chargers, and what programs does it run?
The city-owned Burlington Electric Department serves Burlington, and its EV charger page lists a rebate of $2,500 per port (up to 75% of installed cost) for workplace chargers and $1,000 for multifamily properties (checked Oct 13, 2026).
BED also notes that a bigger charger load may need upgrades to its own equipment, which it bills separately, so we ask for a capacity review before the design is final. Outside city limits, much of Chittenden County is served by Green Mountain Power, which runs a different process; a site on the South Burlington line needs to know which utility it has before anything else.
Rebate amounts and rules change, so we confirm BED's current terms before pricing a project and show the rebate on the quote as its own line.
The code
Which permits and codes apply to EV charging stations in Burlington?
Burlington's Department of Permitting & Inspections handles permits and inspections under a cooperative agreement with the Vermont Division of Fire Safety; installations follow NEC Article 625 and the U.S. Access Board's EV charging guidance.
That agreement matters: in a Vermont town without one, commercial electrical work goes to the state, so a fleet with sites in Burlington and Rutland deals with two offices. The city publishes no review target for an electrical permit; we plan on two to six weeks, our estimate, and longer when a zoning permit is also needed for a transformer pad or a change in how the lot is used.
The Access Board's guidance sets the accessible route to the charger, reach ranges to the screen and cord, and room beside the vehicle. We lay out those spaces first. Earthwork of an acre or more adds Vermont's construction stormwater general permit 3-9020.
The incentives
Which EV charging incentives are open in Vermont?
The federal 30C credit is closed to new chargers: it cannot be claimed for charging property placed in service after June 30, 2026, per the IRS Instructions for Form 8911. State help comes through the Vermont EVSE Grant Program that VTrans describes.
VTrans calls the grant program a multi-agency effort, first funded with Volkswagen settlement money and continued by the Legislature, with community grants run through the Agency of Commerce and Community Development. Rounds open and close, so we check before quoting and never count a grant until it is awarded. BED's rebates come from the utility, not the state, and are a separate line.
We claim no other federal incentive for Burlington chargers. If a federal program opens again, we will add it here with the .gov page that shows it.
The budget
What does an EV charger installation cost in Burlington, and how long does it take?
By Wins Parking's estimate, six Level 2 ports run about $24,200 to $54,500 installed in Burlington and two DC fast ports about $101,000 to $303,000, before rebates.
Trenching distance is the first variable: every foot between the panel and the chargers is cutting, conduit and patching, and downtown lots are often tight against their buildings, so we put chargers near the power. Panel and transformer upgrades are the second: a few Level 2 ports may fit the existing service, while fast chargers usually need new service from BED. Utility lead time is the third, and it often sets the opening date.
Timeline, also our estimate: 8–16 weeks from signed scope to working Level 2 chargers when the service has room, and 26–52 weeks for DC fast charging that needs new service. With only 4 months warm enough for paint and patching, we try to finish trenching before October. The ranges use the Burlington metro's BEA cost index of 100.9 and AFDC's installation cost data.
What would chargers cost in Burlington?
Wins Parking estimateCharger type
Installed cost
$24,200–$54,500
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by Burlington's BEA cost index of 100.9. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are Burlington chargers run day to day?
On the same platform as the parking: Wins sets charging prices and idle fees, monitors every port for uptime, enforces EV-only spaces with the plate cameras and takes payment for parking and charging in one session.
Idle fees keep a full car from holding the port all evening on Church Street. Uptime monitoring flags a faulted charger before a driver finds it, and a technician resets or repairs it. The plate cameras catch gas cars parked in EV spaces.
Owners get one monthly report: parking revenue, charging revenue, energy used, uptime by port and citations. It is the report our EV charging parking management clients get, and it pairs with parking management in Burlington when we run the whole lot.
The neighbors
How does Burlington compare with nearby cities for EV charging?
Burlington has the most public Level 2 ports in the area, 171, but fewer DC fast ports than South Burlington (17), Plattsburgh (30) or Manchester, New Hampshire (34), per AFDC data pulled Oct 13, 2026.
Utilities change at every city line: BED in Burlington, Green Mountain Power across most of the rest of Vermont, a municipal utility in Plattsburgh and Eversource in Manchester. Permit offices change too, from city inspectors in Burlington, South Burlington and Montpelier to the state Division of Fire Safety in Rutland.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| Burlington, VT (this page) | Burlington Electric Department | Burlington Permitting & Inspections | Not published (Wins estimate: 2–6 weeks) | 171 · 8 |
| South Burlington, VT | Green Mountain Power | City of South Burlington | Not published (Wins estimate: 2–6 weeks) | 102 · 17 |
| Montpelier, VT | Green Mountain Power | Montpelier Planning & Community Development | Not published (Wins estimate: 2–6 weeks) | 31 · 8 |
| Rutland, VT | Green Mountain Power | Vermont Division of Fire Safety | Not published (Wins estimate: 2–6 weeks) | 24 · 12 |
| Plattsburgh, NY | Plattsburgh Municipal Lighting Department | City of Plattsburgh | Not published (Wins estimate: 2–6 weeks) | 69 · 30 |
| Manchester, NH | Eversource | Manchester Building Regulations | Not published (Wins estimate: 3–6 weeks) | 37 · 34 |
None of these offices publishes a review target for a commercial electrical permit, so every review time here is a Wins Parking estimate. Rutland has no cooperative inspection agreement with the state, so the Vermont Division of Fire Safety handles electrical work notices there. Ports: AFDC, public and open, pulled Oct 13, 2026.
FAQ
Burlington EV and robotaxi charging: frequently asked questions
Wins Parking does. We design, permit, install and run Level 2 chargers for Burlington apartment lots, enforce EV-only spaces with plate cameras and bill charging with parking. Burlington Electric Department lists a $1,000 rebate for multifamily properties; we estimate a Level 2 port at $4,000–$9,000 installed.
Wins Parking plans and builds charging depots for autonomous and conventional fleets: DC fast chargers, a utility power plan, queue lanes, cleaning bays, pickup zones, access control and cameras. No robotaxi operator has announced Burlington service, and we have no robotaxi project there.
171 Level 2 and 8 DC fast ports at 100 public stations with Burlington street addresses, from Department of Energy data pulled Oct 13, 2026.
No, not for new chargers. Per the IRS Instructions for Form 8911, the 30C credit cannot be claimed for charging property placed in service after June 30, 2026.
Its EV charger page lists $2,500 per port, up to 75% of installed cost, for workplace chargers and $1,000 for multifamily properties, as checked Oct 13, 2026. Confirm current terms with BED.
By Wins Parking's estimate, about $50,000 to $151,000 per port installed, before rebates; new utility service is the biggest variable.
Burlington's Department of Permitting & Inspections, under a cooperative inspection agreement with the Vermont Division of Fire Safety. Work follows NEC Article 625 and the U.S. Access Board's EV charging guidance.
The Vermont EVSE Grant Program, a multi-agency effort that the Vermont Agency of Transportation describes on its Community Charging page. Rounds open and close, so check that page for current status.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 13, 2026
- IRS, Instructions for Form 8911, checked Oct 13, 2026
- U.S. Access Board, EV charging guidance, checked Oct 13, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 13, 2026
- Burlington Electric Department, EV Chargers, checked Oct 13, 2026
- VTrans, Community Charging: Vermont EVSE Grant Program, checked Oct 13, 2026
- City of Burlington, Permitting & Inspections, checked Oct 13, 2026
- Vermont Division of Fire Safety, Municipal Inspection Agreements, checked Oct 13, 2026
- BEA Regional Price Parities (via FRED RPPALL15540), checked Oct 13, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 13, 2026
Last updated

About the author
Ross D. Blankenship
Managing Principal
Ross D. Blankenship is Managing Principal of Wins Parking. He has filed 20 U.S. patent applications on autonomous vehicle parking and charging, EV charging hubs and drone safety, all patent pending. He holds a JD from Washington University School of Law and a BA from Cornell University, and is the author of five books on AI and property.