EV AND ROBOTAXI CHARGING · SOUTH BURLINGTON, VT
EV Charger and Robotaxi Charging Installation in South Burlington, VT
Wins Parking designs, permits, builds and operates EV chargers and fleet charging depots for South Burlington lots. The city lists 102 public Level 2 and 17 DC fast ports with the Department of Energy, about one Level 2 port per 210 residents, and Green Mountain Power supplies the electricity.
- public Level 2 ports (AFDC)
- 102public Level 2 ports (AFDC)
- public DC fast ports (AFDC)
- 17public DC fast ports (AFDC)
- last day to place in service for the 30C credit
- June 30, 2026last day to place in service for the 30C credit
- to BTV, the service airport
- 3 mito BTV, the service airport
Get a free EV charger quote in South Burlington
South Burlington by the numbers
Minimums for housing only
No minimums except multifamily housing (0.75 to 1 space per unit); maximums in City Center
South Burlington Land Development Regulations, Article 13Checked Oct 13, 2026
102 L2 · 17 DC fast
Public charging ports in South Burlington, pulled Oct 13, 2026
DOE Alternative Fuels Data Center, alt-fuel-stations APIChecked Oct 13, 2026
Jun–Sep work season
Months with average lows at or above 50°F; 87.5 in. of snow and 8.2 days at 90°F+ a year
NOAA NCEI, U.S. Climate Normals 1991-2020Checked Oct 13, 2026
100.9 cost index
Burlington-South Burlington, VT Regional Price Parity, 2024 (U.S. = 100)
BEA Regional Price Parities (via FRED RPPALL15540)Checked Oct 13, 2026
BTV · 3 miles
Patrick Leahy Burlington International Airport, the service airport for South Burlington
Great-circle distance from the Census Gazetteer point to the airportChecked Oct 13, 2026
The chargers
What EV chargers does Wins install for South Burlington parking lots?
Level 2 chargers at 2.9 to 19.2 kW and DC fast chargers of up to 500 kW, which add 100 to 200+ miles in about 30 minutes, as the Department of Energy describes them.
Level 2 fits hotel guests parked overnight, office workers and apartment residents. DC fast fits the I-89 interchanges and Williston Road, where drivers heading to Montreal, Montpelier or the ski areas stop for half an hour. A hotel's first phase is often six to ten Level 2 ports, with conduit for one or two fast units.
Wins takes the project from drawings to daily operation. Each session posts to the software behind our plate cameras, so parking and charging income appear on the same statement.
The depot
What does a robotaxi charging depot in South Burlington need?
Fast chargers sized to the fleet's daily miles, a Green Mountain Power service agreement, staging lanes, cleaning bays, a pickup zone, access control and cameras. No operator had announced Vermont service as of Oct 13, 2026.
The nearest announced activity is about 180 miles away in Boston, where Waymo said on Feb. 5, 2026 it is returning to test before Massachusetts allows driverless rides. That is distant context only; no company has named South Burlington, and Wins has no robotaxi work in Vermont.
An airport city is a likely early stop for any fleet, so a lot planned today can leave room for it: power for fast chargers, a place to stage cars off the road, a covered cleaning bay and a pickup lane away from the chargers. Our autonomous vehicle parking overview, the future-proof lot design guide and the EV and AV deployment guide explain each part.
The network
How many public EV charging ports does South Burlington have?
102 Level 2 and 17 DC fast ports at 42 public stations with South Burlington addresses, per Department of Energy data pulled Oct 13, 2026.
For about 21,400 residents, that is one public Level 2 port per 210 people and more fast ports than Burlington's 8, though Burlington has twice the population. The chargers serve visitors as much as residents: hotels, the mall and offices along Williston and Shelburne roads. The Agency of Commerce and Community Development reports 114 public charging stations per 100,000 Vermonters.
Our EV charging ports database refreshes these counts each month from the same federal source.
The power
Which utility serves South Burlington chargers, and what programs does it run?
Green Mountain Power serves South Burlington. Its EV programs are aimed at households, and we found no open commercial charger rebate as of Oct 13, 2026.
GMP also administered Charge Vermont, the state-funded program for workplace, apartment and public-attraction chargers. It accepted applications through Aug. 1, 2026, and its public-attraction funds were already fully subscribed, so we treat it as closed unless a new round opens.
Burlington, across the city line, is served by the Burlington Electric Department, so we confirm the utility at each address before design. GMP then reviews whether the service can carry the new load, and fast chargers usually need a new transformer.
The code
Which permits and codes apply to EV charging stations in South Burlington?
Electrical review and inspection by the city's Fire Marshal and Electrical Inspection service, an electrician licensed by the Division of Fire Safety, NEC Article 625 and Access Board guidance.
Planning & Zoning reviews utility cabinets and other site changes, which can include a transformer pad or a charger island, and a zoning decision can be appealed within 15 days under 24 V.S.A. § 4465. The city publishes no review target; we plan two to six weeks, an estimate.
Our drawings start with the accessible space: a level route, controls and cord within reach and room beside the car for a lift. Trenching an acre or more brings DEC's construction permit 3-9020.
The incentives
Which EV charging incentives are open in Vermont?
Few at the moment. The federal 30C credit cannot be claimed for charging property placed in service after June 30, 2026 (IRS, Instructions for Form 8911), and Charge Vermont closed to applications on Aug. 1, 2026.
The IRS instructions set that federal cutoff. VTrans describes the Vermont EVSE Grant Program as continuing with money from the Legislature, and runs the federal NEVI program for highway corridors, so new rounds may appear. We check both before quoting and never count a grant until it is awarded.
A project in South Burlington today should be budgeted without incentives, which makes the business case rest on charging revenue, guest demand and tenant value.
The budget
What does an EV charger installation cost in South Burlington, and how long does it take?
Wins Parking estimates eight Level 2 ports at about $32,300 to $72,600 installed in South Burlington and two DC fast ports at about $101,000 to $303,000.
Trenching distance is the first cost, so we place chargers near the electrical room when the layout allows. Service capacity is second: two fast chargers usually need a new GMP transformer. Frost is third: charger bases and light-pole footings must go below it in a city with long, hard winters.
We expect 8–16 weeks for Level 2 on an existing panel and 26–52 weeks for fast charging on new service, both Wins estimates. Prices start from U.S. per-port figures and AFDC's installation cost guidance, adjusted by the metro's BEA index of 100.9. Trench patching must fit the 4-month warm season.
What would chargers cost in South Burlington?
Wins Parking estimateCharger type
Installed cost
$24,200–$54,500
Signed scope to energized
8–16 weeks
A Wins Parking estimate, not a quote: Level 2 at $4,000–$9,000 installed per port (U.S. average), scaled by South Burlington's BEA cost index of 100.9. Trenching distance, panel and transformer upgrades and utility lead time move it most. The federal 30C credit cannot be claimed for chargers placed in service after June 30, 2026.
The day to day
How are South Burlington chargers run day to day?
On the platform that runs the parking: Wins sets charging prices and idle fees, monitors every port 24 hours a day, keeps EV spaces clear with plate cameras and bills both on 1 monthly statement.
At a hotel, guests can charge overnight on their room's plate record, while idle fees free fast chargers for the next driver. Cold weather is hard on cables and screens, so our monitoring flags a failed port quickly and we send a technician. The monthly report shows parking income, charging income, kilowatt-hours, uptime by port and citations.
It is our EV charging parking management service, and it pairs with parking management in South Burlington when Wins runs the whole lot.
The neighbors
How does South Burlington compare with nearby cities for EV charging?
South Burlington's 17 fast ports lead this table; Burlington has more Level 2 (171) but 8 fast, and Winooski lists 1 public port, per AFDC data pulled Oct 13, 2026.
Green Mountain Power serves every city here except Burlington, which has its own municipal utility. Each city or town runs its own permit process, and none posts a review target for an electrical permit.
| City | Electric utility | Permit office | Review time | Public ports (L2 · DC fast) |
|---|---|---|---|---|
| South Burlington, VT (this page) | Green Mountain Power | South Burlington Planning & Zoning | Not published (Wins estimate: 2–6 weeks) | 102 · 17 |
| Burlington, VT | Burlington Electric Department | Burlington Permitting & Inspections | Not published (Wins estimate: 2–6 weeks) | 171 · 8 |
| Winooski, VT | Green Mountain Power | City of Winooski | Not published (Wins estimate: 2–6 weeks) | 1 · 0 |
| Essex Junction, VT | Green Mountain Power | City of Essex Junction | Not published (Wins estimate: 2–6 weeks) | 10 · 2 |
| Shelburne, VT | Green Mountain Power | Town of Shelburne | Not published (Wins estimate: 2–6 weeks) | 20 · 0 |
| Montpelier, VT | Green Mountain Power | City of Montpelier | Not published (Wins estimate: 2–6 weeks) | 31 · 8 |
None of these offices publishes a review target for an electrical permit, so each review time is a Wins Parking estimate. Green Mountain Power serves every place here except Burlington (Burlington Electric Department). Ports: AFDC, public and open.
FAQ
South Burlington EV and robotaxi charging: frequently asked questions
Wins Parking does. We design, permit, install and operate Level 2 chargers for South Burlington apartment buildings and condominiums and bill residents through the same app as their parking. We estimate $4,000–$9,000 per installed Level 2 port, and we check for any open state round before budgeting.
Wins Parking plans and builds depot-ready lots with fast chargers, queue lanes, cleaning bays, pickup zones and gated access. No robotaxi operator had announced Vermont service as of October 2026, and Wins has no robotaxi client in the state.
102 Level 2 and 17 DC fast ports at 42 public stations, per Department of Energy data pulled Oct 13, 2026.
Not that we could confirm as of October 2026. Green Mountain Power's EV programs target households, and Charge Vermont, which funded workplace and apartment chargers, closed to applications on Aug. 1, 2026.
Green Mountain Power. Burlington, next door, has its own municipal utility, so the address decides which one reviews the load.
No. The 30C credit cannot be claimed for charging property placed in service after June 30, 2026 (IRS, Instructions for Form 8911).
Electrical review and inspection by the city's Fire Marshal and Electrical Inspection service, an electrician licensed by the Vermont Division of Fire Safety, NEC Article 625 compliance and accessible design per U.S. Access Board guidance. Site changes may also need a zoning permit.
By our estimate, 8–16 weeks for Level 2 on an existing panel and 26–52 weeks for DC fast charging that needs new Green Mountain Power service.
Sources
- DOE Alternative Fuels Data Center, Electric Vehicle Charging Stations, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, Procurement and Installation, checked Oct 13, 2026
- DOE Alternative Fuels Data Center, alt-fuel-stations API, checked Oct 13, 2026
- IRS, Instructions for Form 8911, checked Oct 13, 2026
- U.S. Access Board, EV charging guidance, checked Oct 13, 2026
- NFPA 70, National Electrical Code (Article 625), checked Oct 13, 2026
- City of South Burlington, City Permits, Licenses and Registrations, checked Oct 13, 2026
- Vermont Division of Fire Safety, Electrical Licensing, checked Oct 13, 2026
- Green Mountain Power, Electric Vehicles, checked Oct 13, 2026
- Charge Vermont, checked Oct 13, 2026
- VTrans, EV Charging Infrastructure, checked Oct 13, 2026
- 24 V.S.A. § 4465, checked Oct 13, 2026
- Waymo, Back to Boston (Feb. 5, 2026), checked Oct 13, 2026
- BEA Regional Price Parities (via FRED RPPALL15540), checked Oct 13, 2026
- NOAA NCEI, U.S. Climate Normals 1991-2020, checked Oct 13, 2026
Last updated

About the author
Ross D. Blankenship
Managing Principal
Ross D. Blankenship is Managing Principal of Wins Parking. He has filed 20 U.S. patent applications on autonomous vehicle parking and charging, EV charging hubs and drone safety, all patent pending. He holds a JD from Washington University School of Law and a BA from Cornell University, and is the author of five books on AI and property.
Ready to Unlock Your Parking Revenue?
Get a free, no-obligation proposal. Tell us about your property and we'll show you what's possible.
Or call us directly at (970) 279-1744